New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 4 of 61 FirstFirst 123456781454 ... LastLast
Results 31 to 40 of 607
  1. Join Date
    Oct 2002
    Posts
    40,038
    #31
    Good luck! Kailanga expected completion?


    Sent from my iPhone using Tapatalk

  2. Join Date
    Sep 2007
    Posts
    928
    #32
    4 na pierheads na meh porma ng rebars prior to Soldier Hills overpass.

    Soil testing asa N40++ na ata. Konti nalang para umabot sa Hillsborough on-ramp (N50-55 ata).

  3. Join Date
    Jul 2015
    Posts
    51
    #33
    Quote Originally Posted by shadow View Post
    Good luck! Kailanga expected completion?


    Sent from my iPhone using Tapatalk
    December 2020 ang posted completion. Nawa'y maging tunay

  4. Join Date
    Oct 2002
    Posts
    40,038
    #34
    Tingin ko tatapusin muna yun northbound before gawin yun southbound.


    Sent from my iPhone using Tapatalk

  5. Join Date
    Mar 2008
    Posts
    52,519
    #35
    can't they make them spans longer, so's they do not have to cordon off the road ?

  6. Join Date
    Sep 2007
    Posts
    928
    #36
    Soil testing now commencing on the SB lane as well.

  7. Join Date
    Dec 2005
    Posts
    39,162
    #37
    Quote Originally Posted by absinthe View Post
    Soil testing now commencing on the SB lane as well.
    "It starts...."

    Last Thursday, traffic from C5 to Alabang was crawling.... 2-hr drive .....😂😂😂

  8. Join Date
    Mar 2013
    Posts
    6,160
    #38
    2hrs? Thats a normal day for me. Hehe.

    But yeah, this is idiotic. 2hrs on an expressway.

    Sent from my SM-N975F using Tapatalk
    Last edited by EQAddict; September 21st, 2019 at 10:01 PM.

  9. Join Date
    Jan 2006
    Posts
    12,608
    #39
    Quote Originally Posted by CVT View Post
    "It starts...."

    Last Thursday, traffic from C5 to Alabang was crawling.... 2-hr drive .....SLEX Alabang trafficSLEX Alabang trafficSLEX Alabang traffic
    Thursday and Friday were both bad. It was crawling from C5 exit up to Sucat.


    Sent from my iPhone using Tapatalk

  10. Join Date
    Dec 2005
    Posts
    39,162
    #40
    Quote Originally Posted by Egan101 View Post
    Thursday and Friday were both bad. It was crawling from C5 exit up to Sucat.


    Sent from my iPhone using Tapatalk
    Yes, we're paying toll to be in a heavy traffic...

    That's why the c5 link is a bs project.

    It linked c5 to kaingin, but the latter is a chaotic road with potholes and free for all driving.

    And worse, no link to skyway south nor north and slex north (and south). What's the logic???

    The bright minds in dpwh....
    Last edited by CVT; September 22nd, 2019 at 09:29 AM.

Page 4 of 61 FirstFirst 123456781454 ... LastLast

Tags for this Thread

SLEX Alabang traffic