New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 5 of 61 FirstFirst 1234567891555 ... LastLast
Results 41 to 50 of 607
  1. Join Date
    Jan 2006
    Posts
    12,608
    #41
    Even worse, that Merville link increased the volume of cars in C5.


    Sent from my iPhone using Tapatalk

  2. Join Date
    Jun 2005
    Posts
    3,770
    #42
    Quote Originally Posted by CVT View Post
    Yes, we're paying toll to be in a heavy traffic...

    That's why the c5 link is a bs project.

    It linked c5 to kaingin, but the latter is a chaotic road with potholes and free for all driving.

    And worse, no link to skyway south nor north and slex north (and south). What's the logic???

    The bright minds in dpwh....
    Bakanmay camella homes malapit hehe

    Sent from my MI MAX 2 using Tapatalk

  3. Join Date
    Oct 2002
    Posts
    40,068
    #43
    Quote Originally Posted by CVT View Post
    Yes, we're paying toll to be in a heavy traffic...

    That's why the c5 link is a bs project.

    It linked c5 to kaingin, but the latter is a chaotic road with potholes and free for all driving.

    And worse, no link to skyway south nor north and slex north (and south). What's the logic???

    The bright minds in dpwh....
    Eh para naman sa Villar yan C5 link eh. First project ni Mark as DPWH Sec. Pakapalan ng mukha. Diba magtatayo din sila ng hotel/resort/casino diyan sa C5 extention area na yan.


    Sent from my iPhone using Tapatalk

  4. Join Date
    Oct 2002
    Posts
    40,068
    #44
    Dapat kasi meron provision sa mga highway operators na since nagbabayad tayo ng extra (toll) to used highways para hinde ma traffic sa service roads which are free. Kung ma traffic ng ilan hours meron dapat discount sa toll. Progressive din every hour na Traffic lumalaki yun discount.

    Wala sila gagawin to improved traffic eh dahil either traffic or not magbabayad pa rin talaga dumadaan.

    Unlike EDSA. Walang bayad so kailangan magtiis mga motorists pero sa mga expressway hinde pwedeng ganyan.

    Parang ngayon nababasa ko Super traffic NB dahil sa extention ng skyway eh di dapat magbigay sila ng discount while constructing the extention. Kahit na kung saan segment lsng nag Start usually traffic and kung hanggang saan usually yun nagiging tailend dapat discounted na yun


    Sent from my iPhone using Tapatalk
    Last edited by shadow; September 22nd, 2019 at 10:33 AM.

  5. Join Date
    Sep 2007
    Posts
    928
    #45
    SLEx NB traffic has reached Eton Exit already due to this:



    Trending in Twitter now


  6. Join Date
    Dec 2005
    Posts
    39,162
    #46
    Quote Originally Posted by shadow View Post
    Eh para naman sa Villar yan C5 link eh. First project ni Mark as DPWH Sec. Pakapalan ng mukha. Diba magtatayo din sila ng hotel/resort/casino diyan sa C5 extention area na yan.


    Sent from my iPhone using Tapatalk
    May Mela Hotel na bro...

    May buffet din doon...

  7. Join Date
    Dec 2009
    Posts
    3,006
    #47
    Quote Originally Posted by shadow View Post
    Eh para naman sa Villar yan C5 link eh. First project ni Mark as DPWH Sec. Pakapalan ng mukha. Diba magtatayo din sila ng hotel/resort/casino diyan sa C5 extention area na yan.


    Sent from my iPhone using Tapatalk
    Meron na rin silang train depot brad

    Sent from my SM-A520W using Tapatalk

  8. Join Date
    May 2014
    Posts
    1,318
    #48
    https://www.autoindustriya.com/auto-...rmageddon.html

    Hindi ba dahil sa alam na din ng SLEX management (na mayari/operator din ng Skyway naman) na hindi nila mabibigay yung "service" na binabayaran mo, diba dapat magbigay na sila ng discount habang hindi pa nila nabubuksan uli ang mga sinarang lanes sa SLEX? Kasi yung current na dapat binabayaran mo for the designed "performance". Pero since ang pila umaabot na nga ng Eton, wala din mabigay na solusyon ang SLEX, diba bilang pagbigay konsiderasyon sa mga gusto pa din piliin ang SLEX, bigyan na lang nila ng discount? (Ika nga as thank you na din for "bearing with the inconvenience")?

    Diba dapat magstep-in na din TRB dito para sa pagadjust since wala na yung promised improved traffic flow (habang hindi pa naiaayos yung sa Alabang) at di nila mabigyan din ng timetable kung kelan giginhawa ulit?

  9. Join Date
    Nov 2017
    Posts
    1,748
    #49
    Konting tiis daw sa traffic pero wala discount sa toll. Ganyan din naman sinabi nila habang ginagawa nila skyway stage 1. Yung dating toll fee almost nag increase 200% after construction. Malamang after construction me toll increase SLEX Alabang trafficSLEX Alabang traffic

    Sent from my SM-G955F using Tapatalk

  10. Join Date
    Jan 2008
    Posts
    4,726
    #50
    Quote Originally Posted by 17Sphynx17 View Post
    https://www.autoindustriya.com/auto-...rmageddon.html

    Hindi ba dahil sa alam na din ng SLEX management (na mayari/operator din ng Skyway naman) na hindi nila mabibigay yung "service" na binabayaran mo, diba dapat magbigay na sila ng discount habang hindi pa nila nabubuksan uli ang mga sinarang lanes sa SLEX? Kasi yung current na dapat binabayaran mo for the designed "performance". Pero since ang pila umaabot na nga ng Eton, wala din mabigay na solusyon ang SLEX, diba bilang pagbigay konsiderasyon sa mga gusto pa din piliin ang SLEX, bigyan na lang nila ng discount? (Ika nga as thank you na din for "bearing with the inconvenience")?

    Diba dapat magstep-in na din TRB dito para sa pagadjust since wala na yung promised improved traffic flow (habang hindi pa naiaayos yung sa Alabang) at di nila mabigyan din ng timetable kung kelan giginhawa ulit?
    As usual sa mga government agency na may regulatory power.. kailangan ng complainant.. madami dapat ha

Page 5 of 61 FirstFirst 1234567891555 ... LastLast

Tags for this Thread

SLEX Alabang traffic