New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 8 of 15 FirstFirst ... 456789101112 ... LastLast
Results 141 to 160 of 607

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Join Date
    Sep 2007
    Posts
    928
    #1
    The Big Boss himself checking the final prep works - 01 Dec 2019 commitment met.

    ---

    Abdullah Mambuay
    · 1 hr ·

    METRO MANILA SKYWAY STAGE 2

    Alabang Extension Project

    Mega push to meet the deadline set by SMC to open the temporary all steel skyway ramp and open a SLEX third lane northbound to address traffic problem.. Our DSI PMC Staff has been part of this mega push.









  2. Join Date
    Mar 2008
    Posts
    54,625
    #2
    i just heard over the radio (9:45 am sunday), that northbound slex traffic is back to normal.
    i wonder, is the southbound also back to normal?

    i am a regular user, and i have had to "trim my responsibilities", when the construction started.

  3. Join Date
    Oct 2002
    Posts
    40,599
    #3
    Parang nakakatakot naman yan railings niya. Yero lang yata.


    Sent from my iPhone using Tapatalk

  4. Join Date
    Jul 2004
    Posts
    8,589
    #4
    Temporary ramp looks flimsy.

    I don't know if this can handle the collective weight of vehicles stuck in traffic over a long period of time.

    Hope it is not an accident waiting to happen


  5. Join Date
    Jul 2013
    Posts
    2,450
    #5
    Quote Originally Posted by 111prez View Post
    Temporary ramp looks flimsy.

    I don't know if this can handle the collective weight of vehicles stuck in traffic over a long period of time.

    Hope it is not an accident waiting to happen

    Kaya naman siguro yan.
    Ito nga mga truch na ganito hindi pa bumibigay eh lagi ko nakikita sa hiway


  6. Join Date
    Mar 2008
    Posts
    54,625
    #6
    Quote Originally Posted by 111prez View Post
    Temporary ramp looks flimsy.

    I don't know if this can handle the collective weight of vehicles stuck in traffic over a long period of time.

    Hope it is not an accident waiting to happen

    pang class 1 vehicles lang yata, naman.
    besides, didn't we notice what materials they were using, while they were lego-ing it?
    it looked "materiales fuertes" naman...

  7. Join Date
    Jun 2006
    Posts
    3,306
    #7
    Pwede ba gamitin yung ramp from sta.rosa papuntang Naia and kailangan ba RFID or pwede din cash?

  8. Join Date
    Mar 2008
    Posts
    54,625
    #8
    Quote Originally Posted by jonski View Post
    Pwede ba gamitin yung ramp from sta.rosa papuntang Naia and kailangan ba RFID or pwede din cash?
    rfid lang, ang dinig ko.
    your cash is good, but we require rfid.

  9. Join Date
    Oct 2002
    Posts
    40,599
    #9


    Ano ito? Gagawin na exclusive NB pag morning rush hour then SB pag evening rush hour yun temporary ramp?


    Sent from my iPhone using Tapatalk

  10. Join Date
    Sep 2007
    Posts
    928
    #10
    Quote Originally Posted by shadow View Post


    Ano ito? Gagawin na exclusive NB pag morning rush hour then SB pag evening rush hour yun temporary ramp?


    Sent from my iPhone using Tapatalk
    Per a bubwit re-asphalting of the spur road gawa diba giniba na nila yung concrete barrier to make it 3 lanes.

    Pero namention na ni RSA mismo yung post mo na pwedeng gawin scheme if ever.

    Ngayon naman ay brace for SB traffic tayo due to impending pile boring works.

  11. Join Date
    Oct 2002
    Posts
    40,599
    #11
    Quote Originally Posted by absinthe View Post
    Per a bubwit re-asphalting of the spur road gawa diba giniba na nila yung concrete barrier to make it 3 lanes.

    Pero namention na ni RSA mismo yung post mo na pwedeng gawin scheme if ever.

    Ngayon naman ay brace for SB traffic tayo due to impending pile boring works.
    So yun alabang-Zapote road on-ramp yan i-closed diba?


    Sent from my iPhone using Tapatalk

  12. Join Date
    Sep 2007
    Posts
    928
    #12
    ^^ Not sure Sir, pero kagabi pagdaan ko sa Alabang around 8:30-9pm traffic was uber swabe. Bukas yung steel ramps pero NB lang, sarado SB. Nung Friday rush hour wala nadin traffic, hanggang Alabang viaduct lang. Besides restoring the at-grade to 3 lanes, laking effect nung sarado pa din yung Alabang NB Toll Plaza na temporarily nilipat sa ilalim ng Skyway on-ramp.

    SB naman, they have started pile boring /casting and other civil works at the Soldier Hills overpass. Tama na dito muna focus gawa Holiday season, umpisahan nalang nila yung sa at-grade segment next year na.

  13. Join Date
    Feb 2003
    Posts
    1,038
    #13
    After personally experiencing a Monday morning NB travel, it definitely improved and almost restore the pre-construction time, well actually in my estimates it's almost a 2-3 year restoration of traffic. Dati the start of the pile up starts about 500m before the Caltex Stn and almost standstill, kanina the pile up started na lang right after the Soldiers Hill overpass and the traffic is actually moving and not going into a full stop. Salute to the team who made this wonderful miracle...

  14. Join Date
    Oct 2002
    Posts
    40,599
    #14
    Eh bakit ang daming reklamo nanaman ngayon na heavy traffic. Meron nanaman daw silang sinarang entry or exit kaya nagkagulo nanaman mga tao. [emoji23]


    Sent from my iPhone using Tapatalk

  15. Join Date
    Apr 2012
    Posts
    3,469
    #15
    Sobrang traffic southboud to alabang ngayon
    Sobrang bobo ng planning ng slex skyway sa mga construction nila

    Sent from my SM-A507FN using Tapatalk

  16. Join Date
    Jan 2008
    Posts
    4,725
    #16
    Quote Originally Posted by jaggerx3 View Post
    Sobrang traffic southboud to alabang ngayon
    Sobrang bobo ng planning ng slex skyway sa mga construction nila

    Sent from my SM-A507FN using Tapatalk
    Agree.. dapat yan si ramon ang pitpitin ang yagbols eh.. as always poor planning.. dati poor planning pag government project kaya sabi sa private natin pa handle.. now same banana na sila..

  17. Join Date
    Mar 2008
    Posts
    54,625
    #17
    na-mana lang po nila yan.
    let's not blame them too much... yet.

  18. Join Date
    Oct 2002
    Posts
    40,599
    #18
    Ano nanaman ba ginawa ng skyway management. Ok na nga nun December 1 eh, lahat masaya na ngayon meron nanaman dulang ginawa balik nanaman traffic. So isang linggo lang pala yun sinabi ko Ramon Ang na improvement ng traffic. [emoji23]


    Sent from my iPhone using Tapatalk

  19. Join Date
    Apr 2012
    Posts
    3,469
    #19
    Ramon Ang and whoever plans that should try passing there na walang hagad. Tignan natin kung d sila mabwisit

    Sent from my SM-J730G using Tapatalk

  20. Join Date
    Jan 2004
    Posts
    6,502
    #20
    passed by SLEX at grade section yesterday around 9AM, green and go all the way from Bicutan to San Pedro
    pabalik naman around 12 noon at grade section San Pedro up to C5 green and go din, pero I saw the build up south bound mahaba na from Alabang down ramp to Bicutan

Page 8 of 15 FirstFirst ... 456789101112 ... LastLast

Tags for this Thread

SLEX Alabang traffic