Results 11 to 20 of 600
-
-
Verified Tsikot Member
- Join Date
- May 2014
- Posts
- 1,318
October 13th, 2020 04:06 PM #12I know complete na yung main concrete pouring of the main path of the expressway based on the announcement/news, but may kulang pa sila sa mga on and off ramps.
Question, I am expecting pag talagang operational na ito, from the very beginning wala na silang toll booth, just the scanners?
So hopefully din by November (maybe) mabuksan na yung "gates" para magamit na yan.
-
October 13th, 2020 04:24 PM #13
^^ Ang target talaga ay mainline from Buendia to NLEx v.v., the various exits along the way to follow once ready / as the months go by. Though and pwede nadin buksan / ready [as of now] ay
- Q. Ave NB off ramp / SB on ramp
- G. Araneta NB on-ramp / SB off ramp
Re: T/P, SMC is constructing a makeshift one sa Buendia on-ramp nga eh:
PJ
-
October 14th, 2020 10:07 AM #14
this infra project just goes to show that drinking beer has always been a patriotic endeavor.
-
October 14th, 2020 10:24 AM #15
Iba talaga pag private sectors. Eh kung to follow pa mga entry/exit points it means yun right of way hinde pa handover ng DPWH.
Sent from my iPhone using Tapatalk
-
October 14th, 2020 10:52 AM #16
-
October 14th, 2020 10:59 AM #17
If I'm going to use Skyway pala from Balintawak to Makati, I will need Autosweep installed in my car?
Signature
-
October 14th, 2020 11:52 AM #18
-
Verified Tsikot Member
- Join Date
- Sep 2016
- Posts
- 2,348
October 14th, 2020 02:02 PM #19
-
well, i have never met a victim admitting they maltreated their trans box...
The Toyota Fortuner has landed (fortuner pics at...