Sana turuan din nila ng common sense mga enforcer nila. Lalo sa Sucat at Bicutan.
Parang wlaang logic yung system ng pg papa andar.
Ipapa go isang lane kung kelan barado na papasukan.
Sent from my SM-A507FN using Tapatalk
Sana turuan din nila ng common sense mga enforcer nila. Lalo sa Sucat at Bicutan.
Parang wlaang logic yung system ng pg papa andar.
Ipapa go isang lane kung kelan barado na papasukan.
Sent from my SM-A507FN using Tapatalk
Tuloy pa rin ba yung SLEX to NLEX link na ginagawa ng MetroPacific/Manny Pangilinan?
Naalala ko a few years ago sabay daw itong na approve at gagawin.
Yan ang tanong every Juan/a is eager to know...pero kung gawa tayo "rough estimate" sa sinabi ni Sec Villar:
proposed P3.50/km x approx 18kms Stage 3 = P63 pesos
Skyway Alabang / Filinvest - Dela Ros is currently P164 / P168, plus P63 = P227 / P231 possible from Alabang / Filinvest respectively to NLEx off-ramp (dipa kasama dito toll fee coming from SLEx pag natapos na extension)
Since meron pang Skyway extension na ginagawa sa ngayon sa Susana Hts all the way to existing Skyway to Amkor area, meh panibagong toll fee na naman yun
AT meron pa nung WTF na inalis yung center island para magkaron ng additional lane at the expense of lane road diet, nawala na yung katiting na shoulder lane at kumitid pa to, pwede pa maningil SOMCO diyan for "road improvements"...
Nako, grabe ang GULO diyan sa Bicutan at-grade, talagang free-for-all eh![]()
I was thinking of a national award for RA but this will do
Ang gets Lifetime Contributor Award | Philstar.com
Kung galing ka sa SLEX and exit ka ng NLEX ay saan machacharge ang RFID....Autosweep ba or Easytrip?
Yes po, currently u/c na ang main NLEx-SLEx Connector Road. Nagstart nadin sila i-clear yung ROW sa meh Blumentritt area.
Update as of 12 October 2020, ctto:
Actually, mas nauna pa tong proposal na to kehza sa SS3 ni RSA / SOMCO. But exPNoy for some reason had a dislike for MVP, mapa sa project na to, SCTEx O&M privatization, MRT3 [MPIC are not saints, yet still...]Naalala ko a few years ago sabay daw itong na approve at gagawin.
If coming from SLEx going to NLEx via Skyway, sa Autosweep Sir.
RSA
Despite the rains, we work double time to finish the laying of asphalt on Skyway 3 whenever we get a chance. We are still on track to meet our target December soft-opening. These are the latest photos from Section 2-B before the Pasig River, taken last Friday. Stay safe everyone.
![]()
d/p, apologies
The message you have entered is too short. Please lengthen your message to at least 10 characters.
Last edited by absinthe; October 26th, 2020 at 10:31 PM.
Sana both sides meron etc lane
Bopols kasi mga enforcer tlaga dyan. Barado na naka tingin lang
Sent from my SM-A507FN using Tapatalk