11 October 2020: mainline Skyway connection NB / SB fully slabbed and concreted.
GMANews
I know complete na yung main concrete pouring of the main path of the expressway based on the announcement/news, but may kulang pa sila sa mga on and off ramps.
Question, I am expecting pag talagang operational na ito, from the very beginning wala na silang toll booth, just the scanners?
So hopefully din by November (maybe) mabuksan na yung "gates" para magamit na yan.
^^ Ang target talaga ay mainline from Buendia to NLEx v.v., the various exits along the way to follow once ready / as the months go by. Though and pwede nadin buksan / ready [as of now] ay
- Q. Ave NB off ramp / SB on ramp
- G. Araneta NB on-ramp / SB off ramp
Re: T/P, SMC is constructing a makeshift one sa Buendia on-ramp nga eh:
PJ
this infra project just goes to show that drinking beer has always been a patriotic endeavor.![]()
If I'm going to use Skyway pala from Balintawak to Makati, I will need Autosweep installed in my car?