Thanks for sharing bro. So it basically extends the on-ramp from the current Quirino/SLEX intersection to Nagtahan cor. Magsaysay?
I don't understand the need for it since it's essentially a second level above the exact same route underneath. It will clear up the traffic on the Quirino extension but will just move it to the flyover before Nagtahan bridge.
Sent from my SM-N970F using Tapatalk
https://www.************/2021/01/smc...wGHoYw9F1U&m=1
Sent from my iPhone using Tapatalk
I think when this connector road is done...the c5 truck traffic jams will be reduced. Thats what i hope anyways.
Sent from my SM-N975F using Tsikot Forums mobile app
Madilim talaga sa unlit portions ng skyway stage 3. Bakit ba kasi lagi dark colored asphalt ang ginagamit? Hehe
In some countries, the use of "Glassphalt" that has pieces of waste/recycled glass as part of the mix.
It increases night time visibility as it allows light to "bounce" more per my understanding.
Glassphalt - Wikipedia
But, I don't think we have any equipment (if there is any specialized equiqment needed) that does the mix.
PSA: SOMCO advisory, new additional off-ramps be opened to the public tomorrow:
Some pics of the NB A. Bonifacio off-ramp c/o PJ:
![]()
The E. Rodriguez Sr. off ramp is either another bad design like Q. Ave off ramp or wala sila ibang choice (if left most lane off ramp is not an option). May kanto pagbaba ng ramp.
Sent from my SM-N960F using Tsikot Forums mobile app
Skyway Stage 3 update: A. Bonifacio, E. Rodriguez off-ramps now open
“Our Skyway 3 engineers and construction personnel worked double time to be able to open these two new ramps, better serve motorists, and provide them seamless and convenient travel,” said Ang.
He added that despite the delay brought about by the pending Right-Of-Way (ROW) Acquisition, contractors for SMC infrastructure are working continuously and double-time to open up more access ramps. Ang also hinted which Skyway 3 access ramps are next in line to open.
“Despite delays, we’re excited for the next access points to be opened soon. For northbound motorists, next to be opened will be the Quirino Entry, Nagtahan Entry, Nagtahan Exit, E. Rodriguez Entry, and C3 Exit. For southbound, we will soon open the C3 Entry, C3 Exit, A. Bonifacio Entry, Plaza Dilao Exit, and Nagtahan Exit,” added Ang.
With progress on the project seemingly undeterred, motorists should soon experience the full benefits of the Skyway Stage 3.
Ewan ko ba. Kung kelan nakakalibre, biglang smackdown tong best n the brightest.
Sent from my SM-G998B using Tapatalk
Nag deny na TRB that they issued such order.
So bakit naman I-name dropped ng SMB TRB?
Baka gusto na ng SMB mag start na dapat toll, which is fair. Delaying tactics lang ginagawa ng TRB sa pag approve ng rate.
Payagan na kasi maningil SMB to keep it open.
Gusto yata ng TRB matapos muna yun lahat ng ramps before mag start ng toll eh unfair naman yan.
Sent from my iPhone using Tapatalk
Last edited by shadow; March 16th, 2021 at 09:07 AM.
Ewan pero parang ang mahal kasi ng singil * P274 na one way up to dulo niyan. Alam ko maraming alternative routes pero iba parin ang pagbagtas jan kasi seamless siya.
Mataas ang elevation, kaya ang taas din ng cost. Plus they had to pay a lot for ROW given the areas they went through. Ok na rin kahit mahal, at least there is another route.
This bit of news stinks. Seems like another distraction from trending headlines yesterday.