    Quote Originally Posted by james00112233 View Post
    para daw may makuha pang interest dun sa budget na na-delay....
    Government to release P3 billion for Tarlac-La Union tollway
    By Ma. Elisa P. Osorio (The Philippine Star) Updated February 15, 2010 12:00 AM

    MANILA, Philippines - The government announced it will release P3 billion in order to bankroll the construction of San Miguel Corp., (SMC) and DMCI Inc.’s P19 billion Tarlac Pangasinan La Union Expressway project.

    With the P3 billion government contribution and the P1.5 billion equity from the private sector developer, the consortium now has P4.5 billion which is enough to start the 88.5-kilometer Tarlac-Pangasinan-La Union Expressway. The road is a four-lane highway that will cut travel time from Manila to Baguio by half.

    In an interview over the weekend, Trade Secretary Peter B. Favila said that he has spoken with SMC Corp. president Ramon Ang who asked him to first bridge the government subsidy so that they can start the construction of the expressway as soon as possible.

    The government has committed to provide a P3 billion subsidy for the expressway. However, Favila explained that the Department of Budget and Management will not be able to immediately release the money because DBM needs a lot of paper work.

    In order to immediately start the construction, Favila, who is also the head of the National Development Corp. (NDC), said that NDC agreed to first bridge the government subsidy.

    Favila explained that the NDC will get the money from the P50 billion infrastructure bonds. He said that they will initially sell P3 billion worth of bonds in order to finance the road project. Favila said that the Development Bank of the Philippines (DBP) and the Social Security System (SSS) has already agreed to subscribe to the issue.

    Favila said that they will make the P3 billion bond issue a priority in order to immediately release the fund to the consortium.

    Favila noted that the consortium is ready to start construction for the first nine to 10 kilometers of the expressway. The construction will start where the Subic Clark Tarlac Expressway (SCTEX) ended.

    Favila said that the first part of the construction will be until Tirona. He said that the group has already cleared all the right of way issues until Tirona. The rest of the area is still plagued with right of way concerns, Favila said.

    The construction of the Tarlac Pangasinan La Union Expressway is being undertaken by the Private Infrastructure Development Corp. (PIDC). SMC, through Rapid Thoroughfares Inc., owns 35 percent of PIDC, making it the biggest shareholder in the company. DMCI, on the other hand, has a 32 percent stake. The two own majority or 67 percent of PIDC.

    Aside from the P3 billion government subsidy, the money will come from owner’s equity and bank loans. The owner’s equity is estimated to be at P6.5 billion.

    The road is expected to be completed by 2013.

    ============================

    Total project cost is P19B? That would translate to P214M per km!!!

    And where the hell is Tirona? Baka they meant Gerona?

  2. Join Date
    Jun 2007
    Posts
    3,957
    #122
    haha!....I was also wondering kung san yung tirona...

    anyhow...I would be expecting a lot of delays for this project...as usual..

    not to mention the upcoming election results that could highly influence the building of this road project....

  3. Join Date
    Dec 2005
    Posts
    39,174
    #123
    "The road is expected to be completed by 2013."
    Itaga sa bato,- 2013... Worst case ~4years kung Dec2013 pa ito.....

    9303:grin2:

  4. Join Date
    Nov 2008
    Posts
    182
    #124
    Sana magumpisa na talaga. Sarap siguro byahe sa Norte ng hindi pagod pagdating sa destinasyon.

  5. Join Date
    Nov 2008
    Posts
    182
    #125
    Nagsimula na talaga! Countdown begins

    Esperon: TPLEx to provide seamless high speed travel from Balintawak to La Union
    By Leonardo V. Micua

    ROSALES, Pangasinan, March 2 (PNA) - The Tarlac-Pangasinan-La Union Expressway (TPLEx), whose construction already started on Monday, will assure "seamless high speed land travel" from Batangas to La Union.

    This was assured by Presidential Management Staff Secretary Hermogenes Esperon Jr. in a talk to newsmen while awaiting President Gloria Macapagal Arroyo at Barangay Tumana, Rosales on Monday when she visited the project site.

    He said from Batangas, motorists will pass through South Expressway, then the newly-built C-5 and then to North Expressway and eventually to TPLEx whose construction just started on March 1 in the Pangasinan.

    Already enjoying seamless travel are motorists going to Subic from the Port of Batangas with the now operational Subic-Clark-Tarlac Expressway.

    Esperon said aside from these, there are several more projects coming up. These are Makati-Manila-Infanta; the Tarlac-Baler-Dingalan as well as Nueva-Ecija Casiguran Road.

    He said when the Tarlac to Pangasinan segment of TPLex is completed, the travel time from Balintawak to Pangasinan will only be one hour and forty minutes, plus another 30 minutes to Rosario, La Union and another 30 minutes to Baguio.

    This means, he said, that when going up to Baguio from Balintawak, a motorist would travel for just three hours, compared to five and one half hours at present.

    At the same time, Esperon announced that the start of work on TPLEx in the Pangasinan side was made possible by the accelerated pace of work in land acquisition undertaken by the Department of Public Works and Highways.

    He said the DPWH, in coordination with Sixth District Rep. Conrado Estrella III and Mayor Ricardo Revita, put up a one-stop-shop in Rosales to fast-track the acquisition of the needed right-of-way for TPLEx through expropriation proceedings.

    Property owners readily agreed to sell their land as the buying price of from P80 to P100 per square meter for farm lots was found by them to be satisfactory, he said.

    Esperon said the fast phase of acquisition on the Pangasinan side was the reason civil works had already been started first targeting the segment from Rosales to Moncada, covering a distance of 18 kilometers.

    He said there is big possibility that civil work in the Tarlac side is starting within this month of March, ensuring work in two fronts in the Tarlac-Pangasinan side of the new highway.

    Esperon said that TPLEx is a two-year project to be undertaken under the build-operate-transfer scheme by a consortium of several companies and to be completed when a new President shall have already assumed.

    He said, however, that Mrs. Arroyo is glad that this mega project was planned and started under her administration.

    While in Pangasinan last Monday, President Arroyo thanked a consortium of several companies led by San Miguel Corporation for making TPLEx possible under the BOT scheme.

    The new road, she said, will become the gateway between Northern Luzon Growth Quadrangle and the Urban Luzon Beltway which includes Metro Manila in the next two years.

    More than that, it will place the town of Rosales in a very strategic position, giving rise to its possibility of becoming the next city of Pangasinan.

    While here, Mrs. Arroyo revealed a project in the pipeline proposed by San Miguel Corporation, which is the La Union-Laoag Expressway and a possible expressway from Commonwealth Avenue in Quezon City to Nueva Ecija and then to Cagayan. (PNA)

  6. Join Date
    Dec 2005
    Posts
    39,174
    #126

    Ito ang dapat bantayan ng susunod na Pangulo vs. graft and corruption....

    9404:vader:

  7. Join Date
    Nov 2008
    Posts
    2,421
    #127
    Quote Originally Posted by CVT View Post
    Ito ang dapat bantayan ng susunod na Pangulo vs. graft and corruption....
    baka nga ngayon pa lang eh may under-the-table ng nangyayari...

  8. Join Date
    Dec 2005
    Posts
    39,174
    #128

    ^^^Oo nga bro.,- baka ngayon pa lang kinubra na ang lahat ng "under the table".... Tapos, sasabihin "everything is above board"....

    9505:spam:

  9. Join Date
    May 2006
    Posts
    6,940
    #129
    Sa akin ok lang na tumira sila jan, basta tapusin nila ng magamit agad. Kasi naman talagang tumitira sila kahit walang proyekto kaya parang tanggap ko na na may kababalaghan diyan sigurado

  10. Join Date
    Nov 2008
    Posts
    4,642
    #130
    Quote Originally Posted by oliver1013 View Post
    Sa akin ok lang na tumira sila jan, basta tapusin nila ng magamit agad. Kasi naman talagang tumitira sila kahit walang proyekto kaya parang tanggap ko na na may kababalaghan diyan sigurado
    +1 Tapusin na agad para mas mapadali ang buhay natin.. Wag sanang matulad sa pagkatagal tagal matapos na Skyway

  11. Join Date
    Nov 2008
    Posts
    4,642
    #131
    Quote Originally Posted by oliver1013 View Post
    Sa akin ok lang na tumira sila jan, basta tapusin nila ng magamit agad. Kasi naman talagang tumitira sila kahit walang proyekto kaya parang tanggap ko na na may kababalaghan diyan sigurado
    +1 Tapusin na agad para mas mapadali ang buhay natin.. Wag sanang matulad sa pagkatagal tagal matapos na Skyway

  12. Join Date
    Nov 2007
    Posts
    253
    #132
    oo nga, lahat naman yan o kahit sino maupo dyan e titita at titira yan. importante matapos, maayos pagkagawa at pakinabangan ng taong bayan.

  13. Join Date
    Aug 2005
    Posts
    7,186
    #133
    sana walang namili ng mga lupain na daraanan nito para maibenta ng mas mahal ang lupa sa govt. O kaya ay magtayo ng mga subdivisions.

  14. Join Date
    Nov 2008
    Posts
    182
    #134
    Given factor na talaga sa bawat project, there is improper liquidation. Let us just monitor how well the project will be delivered for public use in 18-24 months time..

  15. Join Date
    Apr 2006
    Posts
    894
    #135
    they did say it's gonna take 1.5 year (I guess from April 1 2010) to finish. My own speculation on how some parts of it would look like based on the construction activities I noticed in some places.


  16. Join Date
    Jun 2010
    Posts
    103
    #136
    I thought hanggang rosario to?

  17. Join Date
    Apr 2006
    Posts
    894
    #137
    it is. these are just the construction sites I spied before learning that DPWH has posted their proposed site plan in their website. The ones I spied were under the "2008-2010 segment", the "beyond 2010" segment can be seen in the DPWH site.

  18. Join Date
    Dec 2007
    Posts
    3,938
    #138
    This project has since been renamed to TPLEx (Tarlac-Pangasinan-La Union Expressway), di ba?

    I've just discovered (using Google Earth) a lot of pictures on the construction sites all along the expressway, you can even imagine the road itself snaking through the farmlands based on the icons of the photos submitted to panoramio.

    Sana matapos na, para mas mabilis ang biyahe. :D

    [size=1]138/3,948[/size]

  19. Join Date
    Sep 2007
    Posts
    928
    #139
    First time to post in this Thread.

    Anyway, this is what DVD boy Llamas' and Satur Ocampo's comrades in the NPA does in the name of progress.

    NPAs raid Tarlac construction site

    By Ric Sapnu The Philippine Star
    Updated February 28, 2012 12:00 AM

    CAMP OLIVAS, Pampanga ,Philippines – At least 30 suspected New People’s Army (NPA) rebels raided a construction site along the Tarlac-Pangasinan-La-Union-Expressway in Tarlac City on Sunday and torched several heavy equipment, police said.

    Senior Superintendent Alfredo Corpus, Tarlac police director, said the armed men, wearing fatigue uniforms, swooped down on the site of RD Policarpio Construction located in Barangay San Manuel, Tarlac City and burned three backhoes, a crane and a grader.

  20. Join Date
    Sep 2007
    Posts
    928
    #140
    TPLEx photos from Panoramio.

    Panoramio - Photos by TPLEX