Ako naman from Pangasinan, kaya malamang dun ako sa last available exit lalabas if completed na ito
Ako naman from Pangasinan, kaya malamang dun ako sa last available exit lalabas if completed na ito
magandang balita ito ... phase 1 magbubukas sa august ... konting tulog na lang
![]()
Pipilitin daw July but sa nakikita ko di kaya. Just last week may around 4 pa na tulay ang di gawa from la paz to gerona. naging problem kasi neto ay original plan is 1 lane and shoulder lang for each flow ang specs ng highway (which is really stupid) then expand to 2 lanes each pag ma reach na same vehicle volume as sctex. Now nag bago plan at i ultimate design na from the start (buti naman, napaka stupid talaga nung unang plan). they are currently working sa expansion at parang hirap ata sila sa adjustments kasi gawa na mga railings at bakod based sa unang specs.
anyone can explain why the name now is TLUTex?and not TPLEx...
sana by December open na nila hanggang Carmen....![]()
^^^ may toll plaza na bago dun sa tarlac-la paz road gawa na kasi yun, aalisin na yung toll plaza na luma.
Kailan kaya magbubukas 'to? At least kahit hanggang Rosales lang muna.
in time for sem break and xmas holiday in Baguio. ilang kilometers yung unang bubuksan to Gerona? ilang minutes/hours kaya maka cut sa travel time, say from the usual 5 hrs to baguio, ilan na lang (if 100 kms/hr average speed sa bagong tplex)?
Magandang area na naman iyan ng hulihan ng overspeeding...
19.8K:sailor: