Quote Originally Posted by joemarski View Post
^

ano po ba ang pipinturahan? wood or concrete?

basic steps:
1 - cleaning
2 - sanding
3 - plastering
4 - "lason" (neutralizer for concrete)
5 - primer application (1st - nth coating)
6 - finishing
7 - cleaning (tapos na... yehey!!!)

some of the steps are required to be repeated in order to achieve the desired "finish".

for most "small" painting jobs, material cost = labor cost.
kadalasan kasi, kahit sa owner na lahat ng gastos sa materials tapos
bayaran niya na lang 'yung taong gagawa (arawan), halos pareho lang talaga. HTH
concrete

Quote Originally Posted by poorprince View Post
5k for painting materials is just about right for a wall 9ft (3m) high covering a 25 sqm area. Assuming the 25sqm (5m x 5m) area is covered on ALL 4 SIDES by a 3m high wall. You might need minimum 2 Gallons flat latex for primer coat and minimum 4 Gal of semigloss latex (2 coats) for the final coat. Plus minimum 2 gallons of concrete neutralizer to prepare your surface since its only "roughed" finish, plus misc items. Labor cost, 4k? dont know, i can haggle for 2k siguro if rough finish. I'm no expert though. Hope this helps.
It's just one long wall. 5 days gagawin. Nagulat lang ako sa cost ng pag paint ngayon Puro algae na kasi yung wall e