Results 61 to 70 of 71
-
Verified Tsikot Member
- Join Date
- Jul 2016
- Posts
- 939
January 18th, 2017 07:35 PM #61This is a reflection of the kinds of road we have here in PH.
Lubak, manhole na walang takip, 2x4 na kahoy or niyog na randomly naiwan sa gitna ng kalsada, humps na pang truck ang sukat at wala marker + naka dark tints ka pa sa gabi, yearly road constructions, rough road sa probinsya, mataas na sidewalk(para makaakyatvat gawing parking lot) and baha pag biglang umulan ng malakas coming from nowhere... Safest choice is PPV.
Nakakasawa na kasi ang yearly pag palit ng tagas na shocks, kalog na tie-rod/ball joint at punit na engine support at suspension bushings...
-
January 18th, 2017 08:14 PM #62
-
Verified Tsikot Member
- Join Date
- Jul 2016
- Posts
- 939
January 18th, 2017 08:28 PM #63
-
Verified Tsikot Member
- Join Date
- Oct 2015
- Posts
- 1,054
January 18th, 2017 09:30 PM #64
-
Verified Tsikot Member
- Join Date
- Feb 2015
- Posts
- 631
January 19th, 2017 01:17 PM #65
-
Verified Tsikot Member
- Join Date
- Aug 2010
- Posts
- 278
January 28th, 2017 09:44 AM #66exterior - fortuner
interior + features - montero
reliability - same
maintenance - mas mura toyota
-
June 27th, 2017 04:26 PM #67
Perhaps the solution is to get in-between, Cross.
CX7/9 or Forester?
High enough for flood and strong enough on rough roads but not as bumpy as SUVs.
-
Verified Tsikot Member
- Join Date
- Jul 2017
- Posts
- 286
July 7th, 2017 05:54 PM #68
-
Verified Tsikot Member
- Join Date
- Jul 2015
- Posts
- 9,583
July 7th, 2017 06:10 PM #69acquired taste.....i like the design if its silver with clear tints
Sent from my SM-G955F using Tsikot Forums mobile app
-
Verified Tsikot Member
- Join Date
- Oct 2014
- Posts
- 1,232
November 15th, 2017 02:09 AM #70
Taguig shouldn't be blamed over cancelled Makati Subway System -mayor | GMA News Taguig shouldn't...
Makati Subway. Completion date: 2025