March 21st, 2021 09:59 PM #301
-
March 22nd, 2021 05:31 PM #302
In other news, seems like S2E NB is getting ready...mag free taste pa kaya? Abangan
So Skyway system for now will be C1 or permanent na kaya ito? Abangan
A gantry and sign installed at the new entry of #skywayextension northbound and says "strictly for etc only" "class 1 only" with those cute vector image of a car and pickup truck included. The Skyway Extension will ease the choke points of Skyway At grade once it opens. Currently the northbound is opening soon while works on the southbound is still on going. The old skyway amkor on ramp at grade was removed to connect this new extension
===
Back to SS3, ayaw kasi magpatoll, ayan reminder lang daw sa lahat, tinadtadan na yung parapet wall
PJ
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,219
March 22nd, 2021 05:38 PM #303
-
Verified Tsikot Member
- Join Date
- Sep 2010
- Posts
- 3,035
-
March 25th, 2021 10:23 PM #305
Moving closer to toll fee collection
JUST IN: Binigyan na ng provisional approval ng Toll Regulatory Board (TRB) ang petisyon na toll rate ng San Miguel Corporation para sa Skyway Stage 3.
Narito ang aprubadong provisional rates:
- Buendia to Sta. Mesa- P105
- Ramon Magsaysay to Balintawak- P129
- Buendia to NLEX- P264
Ayon kay Julius Corpuz, tagapagsalita ng TRB, "Ang provisional rates po kasi, ang ibig sabihin niyan ay hindi pa final at pwede pa 'yang magbago. For the meantime ito muna yung rates na pwede nilang kolektahin sa panahong bibigyan na sila ng authority".
Pero hindi pa agarang makapapaningil ng toll fee ang SMC sa Skyway Stage 3 hangga't hindi pa nabibigyan ng authority to collect ng TRB.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,219
March 25th, 2021 10:28 PM #306nit-picking.
where on earth is the sta mesa exit?
why not call the exit by the street name?
-
Tsikot Member Rank 2
- Join Date
- Jun 2005
- Posts
- 3,774
March 26th, 2021 11:08 AM #307And ano tawag dun sa quezon avenue na exit? Considering major off ramp sya, di nili indicated ang price
Sent from my MI MAX 2 using Tsikot Forums mobile app
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,219
March 26th, 2021 11:14 AM #308
-
March 26th, 2021 01:43 PM #309
re conditions to be given TOP:
TRB approves lower PHP 264 max toll for Skyway 3
But Skyway operator can't charge yet
Brent Co March 26, 2021 12:21
For SMC to be able to charge toll fees, they need to comply with the following requirements from the TRB's press statement:
1. The project must be “substantially completed”. The conditions for substantial completion are as follows:
A.) Project is at least 95% complete.
*An assessment was submitted by an independent consultant earlier this month stating that the facility is already 97%. This assessment is now subject to evaluation and validation by the Board.
B.) The project must conform to the approved final engineering design.
C.) The project is capable of being operated safely and commercially
D.) The toll road facilities thereon have been installed.
*The installation of Toll Collection Equipment and System, which are needed to collect tolls, by the CENTRAL Metro Manila Skyway Corporation, is ongoing. A joint testing amongst the TRB, the proponent and Independent Consultant will commence on Monday, 29 March 2021, in areas where installation was completed, to ensure that there are no system glitches or flaws to avoid a repeat of the RFID problems we had in the past.
TRB says they will publish the provisional toll fee matrix once a week for three consecutive weeks. Once they are satisfied that Skyway 3 meets all the above criteria and that the company has posted the required bond, the TRB will issue the authority to collect and a Notice to Start Collection.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,219
March 26th, 2021 01:47 PM #310
I agree. travelling by train is always the fastest way to travel. kami din dati sa Bangkok, we...
Makati Subway. Completion date: 2025