During college days in the flood prone manila school, you do get caught and be stranded if you dont have a car that can traverse small flood areas. during those days school cancellation happens late, sometimes very late so chances are most student with cars are already in school and will get stranded there if the surrounding streets are flooded. switching from a sedan to a small SUV helped me get out of those situations.
The building and flyovers need to be signed off before the Construction company can get paid, if there is a block in any drainage it will be dealt with before being handed over. There is most probably just a blockage in the drainage pipe and it has not been properly de-silted or the construction company didn't anticipate the amount of water flow going to that specific drain area and had placed a smaller sized drain pipe that can't handle the increased flow of water. Again it might be a design mistake by the engineers but as long as the construction company followed the plans then it is not their fault.



Reply With Quote

sayang naman...
