Quote Originally Posted by kisshmet View Post
The dalian train coaches are taken hostage because of POLITICS because its an achievement of the yellows

When tugade claims that train components are being ordered to improve MRT3 thats a LIE because the current train coaches were made in czech republic and it had long ceased production already

So when political solution is applied to technical problems, then youll have an inkling that things will get WORSE before it gets any better

Sent from my GT-P3110 using Tsikot Forums mobile app
I was able to watch the news about the GM of MRT that was grilled by the goons in congress headed by Mr. Panty Alvarez. Mr. GM said that the dalian trains can be retrofitted or something to fit in the system, but Mr. Panty kept on insisting that it is not compatible with a very commanding force, i was thinking who is more qualified to qualify the new trains, a person inside the company itself (not sure if he's an engineer) or a womanizer congressman that runs a mafia inside congress.

I also wonder where will they get parts that supposedly be coming this Feb. sabi nga it had long ceased production and the trains is already obsolete. baka nagpa machine shop sila sa china, their mighty savior.