I was able to watch the news about the GM of MRT that was grilled by the goons in congress headed by Mr. Panty Alvarez. Mr. GM said that the dalian trains can be retrofitted or something to fit in the system, but Mr. Panty kept on insisting that it is not compatible with a very commanding force, i was thinking who is more qualified to qualify the new trains, a person inside the company itself (not sure if he's an engineer) or a womanizer congressman that runs a mafia inside congress.
I also wonder where will they get parts that supposedly be coming this Feb. sabi nga it had long ceased production and the trains is already obsolete. baka nagpa machine shop sila sa china, their mighty savior.





Reply With Quote
