That is the only way. In fact why double level only? Make it 3 levels, or 4. Set the foundations to be able to handle the additional levels that can be added later on. And adapt modern construction methods. Prefab lahat tapos patong na lang ng patong.
Takot sa traffic while under construction? Tiis ganda. Wala naman asenso kung di magsasakripisyo.




Reply With Quote
