New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 7 of 8 FirstFirst ... 345678 LastLast
Results 121 to 140 of 143
  1. Join Date
    Jun 2011
    Posts
    4,513
    #121
    Quote Originally Posted by brainmafia_310 View Post
    boss sa camella lang po ako nakatira, yung amo ko (may ari ng metrobank) sa grupo namin nagpainstall ng G/S sa bahay nya 1Mw nakalagay.
    1megawatt! (1600kva )parang palasyo cguro bahay nyan.... ang fc nyan nasa 150-240 liters per hr....

    ang eastwood at sm city nasa 4mw ang backup power nila...

    usually kung bahay lang pinakamalaki na 150kva...

  2. Join Date
    Jun 2011
    Posts
    4,513
    #122
    brain mafia... afaik pwedeng lagyan ng ats 5kva.... meron kami ats pwede ito gamitin up to 200 amperes.. 30k lang...

  3. Join Date
    Feb 2008
    Posts
    9,431
    #123
    Brown out ngayon dito sa manila area. Dry run na ba talaga ito?

    Sent from my GT-I9300 using Tapatalk 2

  4. Join Date
    Oct 2011
    Posts
    26,781
    #124
    walandyo! nag blackout saglit pero bumalik naman agad ang kuryente.

  5. Join Date
    Dec 2005
    Posts
    39,174
    #125
    Quote Originally Posted by crazy_boy View Post
    Brown out ngayon dito sa manila area. Dry run na ba talaga ito?

    Sent from my GT-I9300 using Tapatalk 2
    Tanong nation kay Lim o Erap...

    19.0k:higop:

  6. Join Date
    Oct 2011
    Posts
    26,781
    #126
    Quote Originally Posted by Retz View Post
    Magkakaroon ba tayo ng power shortage in 2015 or 2016 just like in cory administration? Ayaw daw mag upgrade or invest sa power plant itong current administration

    Up ko lang ito. This is serious matter.

  7. Join Date
    Jun 2006
    Posts
    2,605
    #127
    Quote Originally Posted by glenn manikis View Post
    1megawatt! (1600kva )parang palasyo cguro bahay nyan.... ang fc nyan nasa 150-240 liters per hr....

    ang eastwood at sm city nasa 4mw ang backup power nila...

    usually kung bahay lang pinakamalaki na 150kva...
    1MW wow hindi lang palasyo! Barangay na yan. Aside from diesel you have to change the oil. Baka 200 liter or more of oil yan. Plus multiple fuel and oil filters. Plus the noise. You need a 40 FT container van for the generator. Tapos most likely specs nyan ay 480 volts 3 phase. You will need a transformer to step in down to 220 volts.
    Last edited by userfriendly; May 13th, 2013 at 12:35 AM.

  8. Join Date
    Nov 2005
    Posts
    2,372
    #128
    Quote Originally Posted by glenn manikis View Post
    brain mafia... afaik pwedeng lagyan ng ats 5kva.... meron kami ats pwede ito gamitin up to 200 amperes.. 30k lang...
    kasing mahal ng ats mo genset pre. saan ka ba nagwowork? baka magkakilala na tayo. hahahah. matagl ako sa federal land, hawak ko residential at commercial building nila, one of the few is GT Tower, property manager nila ako dati. now nasa cvg na ako.

    1Mw nga pre or 1250kVa, dahil may chiller sa bahay si amo.
    Last edited by brainmafia_310; May 13th, 2013 at 01:05 AM. Reason: add info

  9. Join Date
    Nov 2005
    Posts
    2,372
    #129
    Quote Originally Posted by Retz View Post
    Up ko lang ito. This is serious matter.
    boss 2010, pa na issue yan, at inaantay din namin sa industriyang pinagtatrabahuan ko. pero i am sure that it would be earlier due to improved construction procedure at masyadong madaming residential and commercial development ngayon.

    if i am not mistaken, because of epira of 2001, nagamit na ng gobyerno ang mga IPP dahil sa WESm market or nakakasali na ito as source ng NGCP.

    kaya IMHO at AFAIK it will be earlier like 2014 late or early 2015.

  10. Join Date
    Oct 2011
    Posts
    26,781
    #130
    Pag 1600A up advisable ba na air circuit breaker type ang ats mo at hindi ung switch over contacts lang?

  11. Join Date
    Oct 2011
    Posts
    26,781
    #131
    Quote Originally Posted by brainmafia_310 View Post
    boss 2010, pa na issue yan, at inaantay din namin sa industriyang pinagtatrabahuan ko. pero i am sure that it would be earlier due to improved construction procedure at masyadong madaming residential and commercial development ngayon.

    if i am not mistaken, because of epira of 2001, nagamit na ng gobyerno ang mga IPP dahil sa WESm market or nakakasali na ito as source ng NGCP.

    kaya IMHO at AFAIK it will be earlier like 2014 late or early 2015.
    Un na nga sir nakakatakot. Bakit ba ayaw mag invest ng new power plant or upgrade existing power plant? Magkaka problma tayo sa supply nyan sir lalo na booming ang construction ngayon.

  12. Join Date
    Nov 2005
    Posts
    2,372
    #132
    Quote Originally Posted by Retz View Post
    Un na nga sir nakakatakot. Bakit ba ayaw mag invest ng new power plant or upgrade existing power plant? Magkaka problma tayo sa supply nyan sir lalo na booming ang construction ngayon.
    simple, wala pang franchise na binibigay ang gobyerno.

    magkakaroon lang pagnaisaayos na yung epira 2001 through ERC.

    ngayon lang bos, isang power plant bumigay imagine inabot ng 5 ang naoverload ng kasabay. hahahaha.

  13. Join Date
    Oct 2011
    Posts
    26,781
    #133
    ^

    Ang taas ng demand factor natin sa kuryente ngayon summer sir ayun bumigay na.

  14. Join Date
    May 2006
    Posts
    4,342
    #134
    Quote Originally Posted by glenn manikis View Post
    cge.. bigay ko ng factory price.... he.he...

    grabe tawa ko sa post ni ts....
    glenn, pa quote nga ng 6-8 KVA na gen-set. pm mo na lang ako kung di pwede dito plus yung spec sheet. yung silent type ha

  15. Join Date
    Mar 2009
    Posts
    21,667
    #135
    ^^

    *glennmanikis :: Ako rin sana glenn. Yung kaya 1.5hp AC, isang TV, roomlight, isang ref at internet. Pa-PM nalang. Yung tahimik lang din.

  16. Join Date
    Oct 2011
    Posts
    26,781
    #136
    natukoy na daw ung cause ng blackout.....

  17. Join Date
    Jul 2009
    Posts
    10,310
    #137
    heard on the news today, may initial analysis sila na ang cause ng 50% black sa luzon is may nagsiga sa ilalim ng transmission line. im like WTF!!. ganon ka fragile electricity natin? isang siga lang 50% black out na sa buong luzon?

  18. Join Date
    Nov 2005
    Posts
    2,372
    #138
    Quote Originally Posted by BratPAQ View Post
    heard on the news today, may initial analysis sila na ang cause ng 50% black sa luzon is may nagsiga sa ilalim ng transmission line. im like WTF!!. ganon ka fragile electricity natin? isang siga lang 50% black out na sa buong luzon?

    Yes sir nagSIGA ng isang buong transmission line (LUZON GRID) kaya naputol yung source. hahahahaahhaha

  19. Join Date
    Oct 2011
    Posts
    26,781
    #139
    ^

    un nga narinig ko sir. dapat ipagbawal na yan.

  20. Join Date
    Jan 2007
    Posts
    3,431
    #140
    Not as bad as the power crisis in Pakistan.

    Don't wear socks, hot Pakistanis told amid power crisis | Reuters

    Islamabad | Mon May 20, 2013 4:19pm IST

    (Reuters) - Pakistan has told civil servants not to wear socks as the country turns off air-conditioners amid a chronic power crisis and soaring temperatures.

    The government has turned off all air-conditioning in its offices as the country endures blackouts of up to 20 hours a day in some places.

    "There shall be no more use of air-conditioners in public offices till such time that substantial improvement in the energy situation takes place," a cabinet directive said.

    As part of a new dress code, moccasins or sandals must be worn without socks.

    The power shortages have sparked violent protests and crippled key industries, costing hundreds of thousands of jobs in a country already beset by high unemployment, a failing economy, widespread poverty and a Taliban insurgency.

Page 7 of 8 FirstFirst ... 345678 LastLast
Luzon wide power outage!