Quote Originally Posted by qman
Van whats your construction time frame for a typical design 200 SQM FA

And do you add the attic size sa total computation ng floor area and it would be the same rate as the 1st and second floor per SQM.
time frame is 3 1/2 to 4 months depending on the intricacy of the house, area for attic is considered half only, though the pitch of the roof is increased and walls and floor are provided.