Sir max, Footing to 1F Slab is 1.8 meters and height of wall from 1F Slab to 2F Slab is 3.0 meters, architect says we can just use 1F slab beam using 12mm rebars, no more tie beam at the footing, columns are 3 meters apart at perimeter,