New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 3 of 3 FirstFirst 123
Results 21 to 30 of 30
  1. Join Date
    Dec 2005
    Posts
    39,162
    #21
    Oo nga. Now looking at sept 15 for the start of the project... Now, will that overflow into Nov 1? Heavy traffic iyan!!! Kung after Nov 1, overflow naman sa Christmas... Next year na iyan!!! :hysterical:

  2. Join Date
    Nov 2013
    Posts
    2,077
    #22
    Sana naman maayos ang mga alternate routes. Grabe traffic nyan badtrip!

    Posted via Tsikot Mobile App

  3. Join Date
    Jan 2014
    Posts
    1,851
    #23
    Ang mahirap magkasabay yung magallanes at sucat kahit imove ang date. yung magallanes 200days ang repair. grabe ang traffic pag Friday sana mag disc yung skyway kahit paano maka tulong yun.


    Posted via Tsikot Mobile App

  4. Join Date
    Dec 2005
    Posts
    39,162
    #24
    Quote Originally Posted by Yuki13 View Post
    Sana naman maayos ang mga alternate routes. Grabe traffic nyan badtrip!

    Posted via Tsikot Mobile App
    Bro. There is no alternate route... They will leave it to us to figure out our individual alternate routes...

  5. Join Date
    Nov 2013
    Posts
    2,077
    #25
    Quote Originally Posted by CVT View Post
    Bro. There is no alternate route... They will leave it to us to figure out our individual alternate routes...
    i wouldn't be surprised kung ganyan nga mangyari. dumba$$es!

  6. Join Date
    Nov 2013
    Posts
    2,077
    #26
    ayan on hold indefinitely na daw.

    "MMDA Traffic Engineering Center head Noemie Recio said in an interview during the agency’s Sunday radio program on dzBB, that the closure of the bridge’s three eastbound lanes to pave the way for its retrofitting would not push through for now.

    We are not against the project. We just want the DPWH and the contractor to guarantee that there is a proper traffic management plan which includes the alternate routes for motorists and the vehicle volume count [for the] road,” Recio added"

    Sucat bridge repair put on hold while rerouting being prepared | Motioncars

  7. Join Date
    Jan 2003
    Posts
    3,779
    #27
    Quote Originally Posted by Yuki13 View Post
    ayan on hold indefinitely na daw.

    "MMDA Traffic Engineering Center head Noemie Recio said in an interview during the agency’s Sunday radio program on dzBB, that the closure of the bridge’s three eastbound lanes to pave the way for its retrofitting would not push through for now.

    We are not against the project. We just want the DPWH and the contractor to guarantee that there is a proper traffic management plan which includes the alternate routes for motorists and the vehicle volume count [for the] road,” Recio added"

    Sucat bridge repair put on hold while rerouting being prepared | Motioncars
    Considering that the retrofitting is to address the safety issue, what if (knock on wood, huwag naman sana mangyari) something happen's , who will take the responsibility??? For god sake, surely MMDA & Mayor will be quick to wash their hands. For heaven's sake, how long does it take for these 3 agencies to get their heads together and come up with a fix (i'm sure it won't last 12 hrs) rather than kanya-kanya silang press release for 4 days now. Mga putong inah nila taong gobierno nga sila

  8. Join Date
    Oct 2002
    Posts
    15,528
    #28
    Quote Originally Posted by CVT View Post
    Bro. There is no alternate route... They will leave it to us to figure out our individual alternate routes...
    from your place bro.... an alternate route would be via
    San Antonio Valley 1 - Sucat
    Dona Soledad

    kaya lang ang lupet ng traffic sa Soledad pag umaga.

    Another route would be via NAIA3, Villamor, East Service Road..... Kaya lang, ang lupet din ng traffic sa ESR.

  9. Join Date
    Dec 2005
    Posts
    39,162
    #29
    Quote Originally Posted by 1D4LV View Post
    from your place bro.... an alternate route would be via
    San Antonio Valley 1 - Sucat
    Dona Soledad

    kaya lang ang lupet ng traffic sa Soledad pag umaga.

    Another route would be via NAIA3, Villamor, East Service Road..... Kaya lang, ang lupet din ng traffic sa ESR.
    Sa ESR going south(from Sales to the industrial zone), sa umaga, walang traffic, bro.

    May secret kaming alternate route ni ka-Andres bro...



    “Familiarity breeds awe”
    23.9K:thud:


  10. Join Date
    Dec 2005
    Posts
    39,162
    #30
    Quote Originally Posted by macsd View Post
    Considering that the retrofitting is to address the safety issue, what if (knock on wood, huwag naman sana mangyari) something happen's , who will take the responsibility??? For god sake, surely MMDA & Mayor will be quick to wash their hands. For heaven's sake, how long does it take for these 3 agencies to get their heads together and come up with a fix (i'm sure it won't last 12 hrs) rather than kanya-kanya silang press release for 4 days now. Mga putong inah nila taong gobierno nga sila
    Huwag naman sanang mangyari bro... Pero, nata-traffic din kami sa ibabaw ng bridge, while waiting for the intersection to free up>>>> from those coming from East Service Road, from Putatan, Muntinlupa and those turning left to Sucat from SLEX northbound exit>>> where we turn left merging with SLEX northbound....

    Ipagbawal na sana nila ang mga buses at trucks na mag-cross ng Sucat Interchange Bridge....



    “Familiarity breeds awe”
    23.9K:thud:

Page 3 of 3 FirstFirst 123

Tags for this Thread

Sucat Interchange Repair