Results 1 to 10 of 26
Hybrid View
-
January 9th, 2018 06:35 AM #1
Interesting presentation. Who won the bid? though?
Saksi: C-6 Expressway na magdurugtong sa QC at Taguig, sisimulan nang itayo ngayong taon - YouTube
Sent from my SM-G935F using Tsikot Forums mobile app
-
January 9th, 2018 07:06 AM #2
^ smc group ata. That's what i heard anyway
when you look into the abyss, the abyss looks into you
-
January 9th, 2018 07:41 AM #3
https://www.autoindustriya.com/auto-...o-batasan.html
Sent from my SM-G935F using Tsikot Forums mobile app
-
January 9th, 2018 08:13 AM #4
Kawawa yung mga tinamaan sa ROW.
Im interested to know kung ano ang route ng 2nd phase. From batasan to sjdm.
-
January 9th, 2018 02:01 PM #5
sorry no sorry... we need more roads...
Sent from my SM-G935F using Tsikot Forums mobile app
-
January 9th, 2018 02:08 PM #6
-
January 9th, 2018 02:15 PM #7
What I don't understand is why C-6 has this big curve that slows down traffic around Lupang Arenda when it could have cut straight through to Ejercito Ave. after the bridge.
-
January 12th, 2018 09:02 AM #8
Boss pag tinignan mo sa Google Maps aba'y napakaraming boto ang mawawala sayo diyan
===
ROW acquisition for this project will be totally insane.
-
Tsikoteer
- Join Date
- Jul 2013
- Posts
- 2,450
January 9th, 2018 02:31 PM #9
-
January 9th, 2018 02:36 PM #10
they will fix the mrt eventually and maybe upgrade. its an election priority...
Sent from my SM-G935F using Tsikot Forums mobile app
Traffic pa din if last week ang basehan ha.
2023 Toyota Wigo