Results 1 to 10 of 26
-
January 9th, 2018 06:35 AM #1
Interesting presentation. Who won the bid? though?
Saksi: C-6 Expressway na magdurugtong sa QC at Taguig, sisimulan nang itayo ngayong taon - YouTube
Sent from my SM-G935F using Tsikot Forums mobile app
-
January 9th, 2018 07:06 AM #2
^ smc group ata. That's what i heard anyway
when you look into the abyss, the abyss looks into you
-
January 9th, 2018 07:41 AM #3
https://www.autoindustriya.com/auto-...o-batasan.html
Sent from my SM-G935F using Tsikot Forums mobile app
-
January 9th, 2018 08:13 AM #4
Kawawa yung mga tinamaan sa ROW.
Im interested to know kung ano ang route ng 2nd phase. From batasan to sjdm.
-
January 9th, 2018 08:25 AM #5
Ito din ba iyong existing c6 from bicutan to taytay? Bale improve and extend ang kalalabasan?
when you look into the abyss, the abyss looks into you
-
-
January 9th, 2018 08:55 AM #7
I've been waiting for this road project to be pursued. It's one way to decongest C-5, Pasig and Ortigas Extension.
Sana they also already integrate a railway system into that.
-
January 9th, 2018 09:21 AM #8
Dapat i-diretso nila iyan hanggang Sucat at Alabang at sa Laguna (San Pedro, Binan, Sta Rosa etc)
Lalong darami ang mga sasakyan sa Bicutan Interchange.- E Hari ng Bobobo pa naman ng mga TE diyan....
Lalo ng nagkabuhul-buhol ang daloy ng trapik.
-
Tsikoteer
- Join Date
- Mar 2013
- Posts
- 6,160
January 9th, 2018 09:54 AM #9This will help me a LOT. Am all for this.
Sent from my SM-N950F using Tapatalk
-
January 9th, 2018 10:04 AM #10
The more tollways, the better. I do hope they plan the entry and exit points properly. Of what use are tollways when getting in and out is a mess.
but toyota outfits their cars with locally manufactured yokohamas. i just follow suit. after many...
Finding the Best Tire for You