January 22nd, 2013 12:14 PM #21
-
January 22nd, 2013 12:36 PM #22
^ I think what he means is "poste".
Yes, the biga (vertical beams) and the slab should/must be poured together in one go.
-
January 22nd, 2013 04:11 PM #23
Ang alam ko dyan, mas maganda pag isang buhos lang para sabay matuyo. Magkaka problema kasi yan later on duon sa dugtong, pag di sabay natuyo, Nagkakaroon ng seepage at crack, lalo na kung exposed sa elements yan.(as in deck)
-
January 22nd, 2013 05:01 PM #24
Ang sabi sakin ng foreman ko is bubuhusan nila yung biga 3/4 leaving naka expose yung top bar para dun nila tataliin yung pag form ng floor slab (2 layers raw 12mm yung 1st layer then 10mm yung 2nd layer) then pag naka form naraw yung floor slab, tsaka nila bubuhan sabay sabay yung 1/4 ng bigay ang the rest of the slab..
ok ba yung ganun procedure? hinde naman raw mag crack yun kasi nasa tama naman yung mga bar sabi ng foreman ko..
sana naintindihan niyo explanation ko..
-
-
January 22nd, 2013 05:30 PM #26
-
January 24th, 2013 02:41 PM #27
-
-
January 24th, 2013 06:31 PM #29
If i recall correctly from a previous post, the TS did not hire a contractor to build their house and got a foreman instead to oversee the workers?
-
February 6th, 2013 11:45 PM #30
Hello everyone,
Thank you for all your inputs... i did force the foreman to do the pouring of slab and columns all at 1 and they did it.
how long would it take para makapag asintada na sila sa 2nd floor po? is 2 days after the buhos enough? or do i need to wait for 1 week to them to start doing the asintada of the hollow blocks?
other question, regarding open terrace with no roof, what do you guys recommend...plain cement with sahara and painted with water proof paint? or tiles?
TIA po..