Results 41 to 44 of 44
-
August 24th, 2022 06:25 PM #41
NLEX Connector’s España section now 80% complete | TopGear PH
The new segment of the NLEX Connector that will link the Caloocan Interchange on C3 Road to the upcoming España Interchange is now reportedly 80% finished. Once complete, the España Section should help ease congestion by serving as an alternate route for larger trucks and commercial vehicles.
-
Tsikoteer
- Join Date
- Oct 2013
- Posts
- 2,537
August 24th, 2022 07:10 PM #42
-
-
March 27th, 2023 12:51 PM #44
Caloocan-Espana section of NLEX Connector opening today | Autoindustriya
This section has four lanes, beginning from NLEX Segment 10 in C3 Road, Caloocan City to the Espana Interchange in Manila. The entry and exit ramps at the Espana exit are placed alongside the PNR railway crossing on Florentino Street which runs parallel to Espana Boulevard.
Out of sight, out of mind! :grin: Seriously though oil pressure was addressed in the video, both...
Thick (20W-50) vs Thin (5W-20) Engine Oil Tested