New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 2 of 4 FirstFirst 1234 LastLast
Results 21 to 40 of 61
  1. Join Date
    Feb 2005
    Posts
    857
    #21
    Kumag naman talaga Arroyo administration. The real story behind this is that Arroyo promised Terminal 3 to Lucio Tan to strengthen his dominance in the airline business. Who else can finance the almost daily full page ad against Piatco and Fraport last year. Sigurado namang hindi yung mga NAIA1 terminal locators.

    Lahat naman ng BOT projects na existing kung bubulatlatin may problema. Take the case of MRT. Guaranteed ang income ng investor dyan. The government will subsidize kung kulang kita ng investor.

    Stupid din yung reason na Piatco/Fraport did not build an underground tunnel. Dahil lang ba duon e bulukin na natin ang Terminal 3. E why don't they just force them to build the tunnel.

    Binibenta ng government ang Terminal 3? Gago ba sila? Di pa nga nila mabayaran ang Fraport sa gastos sa Terminal 3 which Supreme Court said na dapat bayaran. Ang gulang talaga ng gobyerno.

    Walang pera ang Piatco? E kung wala, bakit natapos yung terminal? The reason why hindi nila mapatakbo ang terminal is because the Japanese contractor who owns the electronic systems of the terminal ay hindi rin mabayaran ng government. Hindi nila kasi maloko yung hapon.

    Wala nang maginvest sa Pilipinas kasi puro kumag talaga nasa government. Self interest lang ang priority.

  2. Join Date
    Mar 2003
    Posts
    2,243
    #22
    dapat talaga buksan na yan at all cause, sumundo kami nung monday sa NAIA terminal 1. Ang luma na talaga.

  3. Join Date
    Oct 2002
    Posts
    3,883
    #23
    Quote Originally Posted by ownertype
    dapat talaga buksan na yan at all cause, sumundo kami nung monday sa NAIA terminal 1. Ang luma na talaga.
    sabi nga ng galing doon lok-bu na raw talaga terminal 1...

  4. Join Date
    Mar 2005
    Posts
    2,019
    #24
    the main reason kasi gusto ng governmant na magkaroon ng kita dyan sa terminal3 na yan! walang hiya tlaga yang unano na presidente natin. wlang gnawa kung hindi mangurakot ng mangurakot!

  5. Join Date
    Feb 2005
    Posts
    857
    #25
    Huwag kayo magalala. Bubuksan talaga ng gobyerno yan no matter what happens. Lahat ng paraan gagawin nila. Nandyan yung takutin mga tiga Fraport, gumawa ng bagong batas, sulsulan ang supreme court, etc. Kung tutuusin naman, puede nila buksan. Kesihodang pasukin ng PSG yang terminal at the pretense of national interest. Ang problema, hindi nila maloko yung ibang contractor who controls the systems inside the airport. Aba! Ang gusto ba naman ng gobyerno e operate nila muna tsaka na ang bayad. Kung tutuusin, wala namang investment ang gobyerno dyan except the land.

  6. Join Date
    Mar 2005
    Posts
    2,019
    #26
    in short gago talaga ang gobyerno natin! ibang klase talaga yung unano na to, tapos sasabihin nya na dapat corruption free ang ibang mga department ng government! bullshit!

  7. Join Date
    Oct 2002
    Posts
    2,812
    #27
    ako pag umuuwi iwas talaga ako dyan sa NAIA na yan...daming mga makakapal ang mukha dyan...kaya lagi PAL ang sinasakyan ko para dun ako sa magandang terminal at wala gaanong mga buwaya..

  8. Join Date
    Mar 2005
    Posts
    227
    #28
    With this government..Wala tayong future!!! This government is run by jueteng lords at si JOSE PIDAL!!!

  9. Join Date
    Apr 2004
    Posts
    653
    #29
    buksan nayang naia 3..pleeeassseee..nakakahiya na ang kalumaan ng naia 1..!..lalo na ang dismal state of kubetas..nagmumura mga pasahero ayaw mag-flush at me mga kung ano-anong DIY para lang magamit..dyaheeee..!:seeth:

  10. Join Date
    Feb 2005
    Posts
    857
    #30
    Kung hindi pinag-interesan ng gobyernong walang mandate, matagal nang bukas yan. In fact, before the conroversy, concessionaires were already constructing their stores inside. Ang motto ni GMA "Kung hindi ako makikinabang, walang makikinabang" and "what are we in power for?"

    Isa pa, kaya tayo nagka-fiscal crisis, inubos ni GMA ang pondo ng gobyerno before the election. Ginastos sa kampanya and yung natira, inilabas nila sa Land Bank and PNB just in case matalo sa eleksyon, walang pondo yung papalit. Tanong ninyo sa mga tiga-Land Bank at PNB.

  11. Join Date
    Sep 2003
    Posts
    1,202
    #31
    nak nang delay na naman ang opening ng Terminal 3 next year 2nd quarter na bagong schedule.

    Gandan open sana ngayon daming OFW pauwi luwang ng parking dyan laki pa ang immigration counters

  12. Join Date
    Aug 2005
    Posts
    117
    #32
    Oi! Kami ang main contractor dyan hehehe....
    Dami ako alam dyan.

  13. Join Date
    Feb 2005
    Posts
    857
    #33
    Quote Originally Posted by Greaseman
    Oi! Kami ang main contractor dyan hehehe....
    Dami ako alam dyan.
    Sige nga. Paki-umpisahan na ang nalalaman.

  14. Join Date
    Jun 2005
    Posts
    325
    #34
    Quote Originally Posted by Greaseman
    Oi! Kami ang main contractor dyan hehehe....
    Dami ako alam dyan.
    *Greaseman, taga Takenaka ka ba?
    Kaya nyo raw tapusin lahat ng pending works in 90-days (except underground tunnel, of course); and these includes:

    -commissioning (burn-in routine) of all equipment (power, aircon, lifts, carousels, and ancilliaries, etc.)
    -training of airport personnel

    Magkano pa ba collectible ninyo from the project? USD75M diba?

  15. Join Date
    Aug 2005
    Posts
    117
    #35
    Quote Originally Posted by jaeger
    *Greaseman, taga Takenaka ka ba?
    Kaya nyo raw tapusin lahat ng pending works in 90-days (except underground tunnel, of course); and these includes:

    -commissioning (burn-in routine) of all equipment (power, aircon, lifts, carousels, and ancilliaries, etc.)
    -training of airport personnel

    Magkano pa ba collectible ninyo from the project? USD75M diba?

    Actually Dec.03 pa lang ready na yan, almost 90% tapos na namin ang
    commissioning at turn-over sa piatco, all equipments are 100% ready
    then suddenly the issue came up so stop lahat ng activities pero after
    that notice tuloy pa din ang maintenance namin kung papasok kayo doon
    parang bago pa din dahil malinis. Dati dami ng nagtre-trains dyan kawawa
    nga yung iba dahil nagresign sa mga work nila tapos di rin pala mabubuksan.

    Tunnel issue? malamang budget ang dahilan.
    Finishing ng Duty free shops di sakop sa contrata namin
    (this is very big area 4 levels)

    Collectible? medyo malaki US$$$ pero di ko mako-confirm.

    Dami ako pics upload ko mamaya.

  16. Join Date
    Aug 2005
    Posts
    117
    #36
    See the date of the pics 9/03!.

  17. Join Date
    Aug 2005
    Posts
    117
    #37
    another pics

  18. Join Date
    Aug 2005
    Posts
    117
    #38
    another...

  19. Join Date
    Aug 2005
    Posts
    117
    #39
    eto pa...

  20. Join Date
    Sep 2003
    Posts
    1,202
    #40
    wow ganda dapat talaga gamitin na yan me mga tao bang nagme maintain nyan hanggang ngayon. Sayang lang ang bayad sa kanila kasi di naman kumikita ang terminal

Page 2 of 4 FirstFirst 1234 LastLast
Airport Terminal 3