Results 11 to 14 of 14
Threaded View
-
December 12th, 2007 08:51 PM #1
here's a photo i took while waiting for my turn at the SLEX toll exit of filinvest.
i can't figure out why SLTC is taking such a long time to repair the damaged asphalt. the expansion work of the SLEX is already causing traffic to motorists and still they can't patch up this small area of the road. it's been like that for months now.
I’m going up to Baguio this Monday. How are the roads?
2023 Toyota Wigo