Ok, I will be posting some pictures soon.

The installation of the rack and pinion steering is complete. Took us 3 days to complete it from scratch.

My brother just left for US for a 2 week vacation. As soon as he comes back, I will pull out the 302 for reboring to accept the 0.040" pistons, resurface of the deck, align boring for the 4 bolt main caps.

Then install the roller cam and lifter. The Cleveland heads will be rebuilt with Stainless steel valves and bronze valve guide.

I will do the porting and polishing myself.

Then it will be mounted on an engine stand and run for break in. I am still scouting for a toploader.