Modern carparks are designed for at least 2.1m. Sm mall seem to target 2.4m. Ayala malls tend to be tighter.

Concrete for buildings go thorough a massive (forgot the name) vertical pipe and concrete is poured up that way. The concrete trucks just stay in the street. If you ever pass through Makati or bgc at odd hours, you will see this in progress.


Sent from my iPhone using Tapatalk