Quote Originally Posted by vinj View Post
I can't help but compare as to how PITA the SLEX RFID process is compared to the NLEX RFID installation (pag walang pila, less than 10 minutes you're out). Basically more documentation is required for the SLEX RFID installation.
Well most of the time spent was for waiting
Mga more or less 10 mins for processing and sticker installation