New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 11 of 15 FirstFirst ... 789101112131415 LastLast
Results 201 to 220 of 607

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Join Date
    Oct 2002
    Posts
    40,599
    #1
    Quote Originally Posted by jaggerx3 View Post
    Muntinlupa LGU is lazy as F.
    Wala man lang gawin na solusyon.
    Kung ako dyan, ipapa halt ko gawa tulad ng ginawa sa QC kung walang maibigay na alternative ang contractor o kung walang waive sa toll fee.

    Sent from my SM-A507FN using Tapatalk
    Anong ngang solusyong ang dapat gawin? Saan alternative routes meron diyan? EH either service road or slex lang naman eh, saan pa ba? Eh kung meron palang ibang dadaanan bakit Hinde ka doon dumaan para maiwasan mo traffic sa slex? Just asking dahil hinde ko alam kung melrn nga ibang pwedeng dadaanan.

    Sa toll TRB lang pwede gumawa niyang not LGU.


    Sent from my iPhone using Tapatalk

  2. Join Date
    Dec 2019
    Posts
    3
    #2
    eto kasing ginagawa nila ngayon, extension lang ng skyway entry. pinilit isaksak sa congested area.
    Band aid solution lang to sa totoo parang dii pinagisipan talaga.
    ang goal daw ay to increase the volume ng vehicle na maaaccomodate. E yearly tumataas din ang volume ng vehicles sa kalsada so cancel out lang yan.

    ang dapat nila ginawa from Susana exit direcho na skyway tawid sa lake sa likod dire-direcho labas either edsa or c5. That way yun mga galing south na wala naman business sa alabang, sucat, bicutan hindi na dun dadaan mas mabilis at efficient ang byahe. yun ang sureball na bawas volume ng vehicles sa alabang.

  3. Join Date
    Oct 2002
    Posts
    40,599
    #3
    Ang ginagawa naman yata na extension eh para mabawasan yun gagamit sa at-grade section dahil doon talaga wala ng expansion na pwedeng gawin.


    Sent from my iPhone using Tapatalk

  4. Join Date
    Oct 2002
    Posts
    40,599
    #4
    Ano nga pala ang plano nila sa entry to skyway from sucat? Traffic din yan diba?


    Sent from my iPhone using Tapatalk

  5. Join Date
    Jan 2006
    Posts
    12,608
    #5
    Quote Originally Posted by shadow View Post
    Ano nga pala ang plano nila sa entry to skyway from sucat? Traffic din yan diba?


    Sent from my iPhone using Tapatalk
    Single lane lang entry to Skyway from Sucat. Skyway is the fastest way to Makati but you will have to bear with the bottlenecks at the exits (Magallanes, Don Bosco, Amorsolo, and Buendia). If you are going to BGC from Sucat, shortest route pa rin yung SLEX (at grade) then exit at C5.

  6. Join Date
    Sep 2007
    Posts
    928
    #6
    Stage 2 Expansion c/o PG as of 04 March 2020

    ===

    Philip
    3.58K subscribers

    Skyway overpassing zapote and filinvest exit. Civil work up to coping beam scheduled to be completed in May 2020. Beam and installation of slabs to follow.

    Southbound on going - civil work up to coping beam to be completed for September - Beams and slabs to follow.

    Ramps to be completed after the opening of the main section to minimize congestion

  7. Join Date
    Jan 2016
    Posts
    6,813
    #7
    Mag ease up kaya ang traffic sa alabang because of the lockdown?

  8. Join Date
    May 2014
    Posts
    14,700
    #8
    Quote Originally Posted by papi smith View Post
    Mag ease up kaya ang traffic sa alabang because of the lockdown?
    baka sa.monday bro pag fully implemented na yun citywide quarantine

    Sent from my MI MAX 3 using Tapatalk

  9. Join Date
    Apr 2006
    Posts
    419
    #9
    Slex and startoll are not closed, may nakakadaan.

    Easy access with the “correct password” Alam nyo naman nasa pinas tayo, di ba?

    Kaya pa makadaan all the way to Matnog.

  10. Join Date
    Sep 2007
    Posts
    928
    #10
    S2E works resuming tomorrow:

    San Miguel Corporation to resume construction of Skyway Extension on May 15
    No adjusted date of completion has been determined yet
    by Sharleen Banzon | 4 hours ago

    xxx

    SMC guaranteed that workers will follow the basic rules of social distancing. Masks, gloves, hand sanitation, and disinfection facilities will be provided, and workers will be housed on-site.

    Skyway management said that upon the resumption of work, about 700 meters of Lane 3 of the Skyway At-Grade northbound section, from the old Alabang Entry Plaza, will be closed to traffic for one month. This is to enable the installation of scaffoldings to build the columns for Pier 34-39.

  11. Join Date
    Oct 2002
    Posts
    40,599
    #11
    Quote Originally Posted by absinthe View Post
    S2E works resuming tomorrow:

    San Miguel Corporation to resume construction of Skyway Extension on May 15
    No adjusted date of completion has been determined yet
    by Sharleen Banzon | 4 hours ago
    Eh bakit northbound nanaman eh akala ko southbound na ang ginagawa?


    Sent from my iPhone using Tapatalk

  12. Join Date
    Jul 2009
    Posts
    2,628
    #12
    Quote Originally Posted by shadow View Post
    Eh bakit northbound nanaman eh akala ko southbound na ang ginagawa?


    Sent from my iPhone using Tapatalk
    meron din northbound from the foot of alabang viaduct may part na 1 or 2 lanes ang di magamit dahil sa construction. I wonder how traffic there is it today?

  13. Join Date
    Oct 2002
    Posts
    40,599
    #13
    Quote Originally Posted by babkalakal View Post
    meron din northbound from the foot of alabang viaduct may part na 1 or 2 lanes ang di magamit dahil sa construction. I wonder how traffic there is it today?
    Akala ko tapos na NB?


    Sent from my iPhone using Tapatalk

  14. Join Date
    Sep 2007
    Posts
    928
    #14
    Skyway management said that upon the resumption of work, about 700 meters of Lane 3 of the Skyway At-Grade northbound section, from the old Alabang Entry Plaza, will be closed to traffic for one month. This is to enable the installation of scaffoldings to build the columns for Pier 34-39.
    Ito po sha, photos courtesy of PJ






  15. Join Date
    Oct 2002
    Posts
    40,599
    #15
    Quote Originally Posted by absinthe View Post
    Bakit hinde pa nila tinuloy before wince andoon na sila sa NB gumagawa? Diba nakatayo na rin mga scaffolding during that time.


    Sent from my iPhone using Tapatalk

  16. Join Date
    Oct 2002
    Posts
    40,599
    #16
    Ibig sabihin galing doon sa ilalim ng tulay yan? Pwede na rin sila umakyat?

    So aalisin na yun entry ngayon before sucat?
    Sent from my iPhone using Tapatalk

  17. Join Date
    Jan 2007
    Posts
    2,811
    #17
    I think that alabang viaduct entry ramp is the proper permanent replacement for the temporary steel ramp that they used before. No idea if the sucat entry will be removed.

  18. Join Date
    Sep 2007
    Posts
    928
    #18
    Wala lang updates:

    • S2E works ongoing kahit veerus, SB pile works at Alabang viaduct now. Hindi muna passable yung elevated MMDA pedestrian footbridge going to Starmall gawa pinutol putol to make for the piers.
    • Hillsborough SB off-ramp opened again as of 21 July 2020, tapos na pile boring works and 3 lanes at-grade restored pero the outermost lane meh traffic cones hanggang somewhere near PS15 ata, bago mag Alabang/South Station Exit [pero take note, iduduktong pa nila sa existing elevated section so isasara din nila yung NB / SB to "close the gap" sometime in the future]

  19. Join Date
    Sep 2007
    Posts
    928
    #19
    Quote Originally Posted by absinthe View Post
    Wala lang updates:

    • [pero take note, iduduktong pa nila sa existing elevated section so isasara din nila yung NB / SB to "close the gap" sometime in the future][/I]
    Ito na nga po - Skyway NB onramp near Amkor is temporarily closed today to give way to "close the gap"





    SOMCO Twitter

  20. Join Date
    Sep 2007
    Posts
    928
    #20
    on-ramp demolition ongoing [tiis lang po ulit sa traffic]



    PJ

Tags for this Thread

SLEX Alabang traffic