June 18th, 2020 12:01 PM #431
Ibig sabihin galing doon sa ilalim ng tulay yan? Pwede na rin sila umakyat?
So aalisin na yun entry ngayon before sucat?
Sent from my iPhone using Tapatalk
-
Tsikot Member Rank 2
- Join Date
- Jan 2007
- Posts
- 2,228
June 18th, 2020 07:51 PM #432I think that alabang viaduct entry ramp is the proper permanent replacement for the temporary steel ramp that they used before. No idea if the sucat entry will be removed.
-
July 24th, 2020 03:39 PM #433
Wala lang updates:
- S2E works ongoing kahit veerus, SB pile works at Alabang viaduct now. Hindi muna passable yung elevated MMDA pedestrian footbridge going to Starmall gawa pinutol putol to make for the piers.
- Hillsborough SB off-ramp opened again as of 21 July 2020, tapos na pile boring works and 3 lanes at-grade restored pero the outermost lane meh traffic cones hanggang somewhere near PS15 ata, bago mag Alabang/South Station Exit [pero take note, iduduktong pa nila sa existing elevated section so isasara din nila yung NB / SB to "close the gap" sometime in the future]
-
-
August 24th, 2020 10:45 PM #435
Ito na nga po - Skyway NB onramp near Amkor is temporarily closed today to give way to "close the gap"
SOMCO Twitter
-
-
-
October 12th, 2020 02:56 PM #438
Major revision from the SMC render: the existing on-ramp near Amkor is being totally removed [I really thought the outermost lane will be retained].
So, for buses / vehicles coming from Alabang ilalim / VillarMall / SouthStation / old National HWay...Southstation onramp it is?
PJ
-
October 12th, 2020 06:22 PM #439
-
October 15th, 2020 07:59 PM #440
October 2020 update from Dmitrivalencia...progressing nicely but Dec 2020 completion even just for NB segment looks out of reach ATM - dami pang need gawin. 1Q 2021 looks more like it.
===
More unibridge girders installed for the NB part of the #SkywayExtensionProject as we reach the month of October 2020. You could also see more translab installed on the nb route. A big portion of land just before filinvest exit can be seen , probably a toll plaza for the ramp entry my hunch. As for the SB alignment, some of the columns have coping beams installed particularly the one after Filinvest interchange. As for the columns you could see corbel. The amkor on ramp northbound to Skyway elevated is almost completely removed. Is a December 2020 opening doable for this northbound route? what do you think?