New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 1 of 30 1234511 ... LastLast
Results 1 to 10 of 607

Hybrid View

  1. Join Date
    Aug 2003
    Posts
    3,273
    #1
    so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.

  2. Join Date
    Feb 2015
    Posts
    174
    #2
    Quote Originally Posted by roninblade View Post
    so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.
    May mga banner about 10B pesos skyway extension up to mcx ata that started June2019 daw. Di kaya yun na yun?

    Sent from my ASUS_Z00AD using Tapatalk

  3. Join Date
    Jun 2018
    Posts
    1,475
    #3
    Quote Originally Posted by roninblade View Post
    so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.
    Skyway extension project, if I'm correct, sir. I think someone posted a picture of an "announcement" in a different thread here. How long was the traffic?

  4. Join Date
    Oct 2002
    Posts
    40,126
    #4
    Extension daw ng skyway to Susana heights.


    Sent from my iPhone using Tapatalk

  5. Join Date
    Mar 2008
    Posts
    52,778
    #5
    Quote Originally Posted by shadow View Post
    Extension daw ng skyway to Susana heights.


    Sent from my iPhone using Tapatalk
    hey! i can use that!

  6. Join Date
    May 2014
    Posts
    14,700
    #6
    Quote Originally Posted by dr. d View Post
    hey! i can use that!
    baka retired kana bro bago pa matapos yan LOL
    btw di ba makitid susanna heights exit?

  7. Join Date
    Mar 2008
    Posts
    52,778
    #7
    Quote Originally Posted by ninjababez View Post
    baka retired kana bro bago pa matapos yan LOL
    btw di ba makitid susanna heights exit?
    retirement is for the elderly, baby.
    heh heh.

  8. Join Date
    Jan 2017
    Posts
    43
    #8
    it's Skyway extension.....
    kamot ulo na lang ako kung bakit di pa nila ginawa yan while they're working the Alabang segment.
    kung inayos na lang kaya nila noon hanggang Alabang na ang entry at exit, tapos Susana na ang dulo.
    ...realizing now the Amkor ramp (entry/exit) naging bottleneck north and south bound.

  9. Join Date
    Oct 2002
    Posts
    40,126
    #9
    Kayo naman yun budget importante. Itong segment eh ₱10B na at least according to the photo posted.

    Sana nag ambag mga affected sa traffic. ngayon para nasabay na dati. ✌🏼️[emoji39]


    Sent from my iPhone using Tapatalk

  10. Join Date
    Aug 2003
    Posts
    3,273
    #10
    thanks to all who replied

    major construction pala 'to. i remember when the first phase was constructed in the 90s - 2+ hours of traffic to makati, and that was with less vehicles on the road. it did get better after but, fsck me, it was hell during construction. pretty much what's happening with the other phases of the skyway happening around metro manila.

    looking forward to the skyway being extended to susana. in the meantime, i think i'll move back into the city for 2-3 years until this all gets sorted out.

    sino na nga yun lilipat daw ng tagaytay at commute daily to bgc? good luck with that and this construction hahahah

Page 1 of 30 1234511 ... LastLast

Tags for this Thread

SLEX Alabang traffic