New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 4 of 8 FirstFirst 12345678 LastLast
Results 31 to 40 of 71
  1. Join Date
    Dec 2005
    Posts
    39,162
    #31
    Quote Originally Posted by Egan101 View Post
    When the new ramp from Merville opened, the northbound traffic of C5 from SLEX got worse. Right after exiting SLEX, it is bumper to bumper up to the new U-Turn slot in front of Heritage. Usually, traffic on that part is light. You can even do triple digit speeds from SLEX exit up to the ridge before the exit to Bayani road.
    It is because the vehicles from Merville, Moonwalk, Bicutan, Paranaque, Las Pinas, Cavite do not get filtered passing through Sales or Bicutan to get to C5.... Plus of course those coming from SLEX south....

    So, C5 is now the new bottleneck....

    And Kaingin road is still a crater of an experience after C5 southlink.... from 4 lanes and together with counterflow of motorcyles and tricycles and what have you to just one lane in a bumpy and water-soaked soil road.... Up to the intersection with Multinational Village....

  2. Join Date
    Feb 2005
    Posts
    6,099
    #32
    Quote Originally Posted by EQAddict View Post
    Is it just me or is traffic getting even worse nowadays? Edsa and c5 are real slogs......

    Really need Skyway Stage 3 operational asap.




    Sent from my LYA-L29 using Tapatalk
    It's getting worse (and unpredictable)

    From Caltex Wilson to Edsa Shang earlier, it took me 57 mins. Skyway Stage 3 (SLEX-NLEX connector road)




    Talk to yourself, DumbAsh Skyway Stage 3 (SLEX-NLEX connector road)

  3. Join Date
    Nov 2002
    Posts
    1,751
    #33
    Quote Originally Posted by myas110 View Post
    By the way, this is different from Metro Pacific's SLEX-NLEX connector road.
    nalilito nga ako sa dalawa kasi most news use both Skyway Stage 3 and SLEX-NLEX Connector Road in the same articles. so since si Ramon Ang ang nagpromise na operational by March 2020, it pertains to Skyway Stage 3, right? hmm cautiously optimistic here kasi sa latest drone video update parang andami pang kulang. pero am very excited about this and sana nga mabawasan traffic sa edsa at C5.

    Last edited by coiter; January 7th, 2020 at 07:52 PM.

  4. Join Date
    Sep 2016
    Posts
    2,253
    #34
    Quote Originally Posted by coiter View Post
    nalilito nga ako sa dalawa kasi most news use both Skyway Stage 3 and SLEX-NLEX Connector Road in the same articles. so since si Ramon Ang ang nagpromise na operational by March 2020, it pertains to Skyway Stage 3, right? hmm cautiously optimistic here kasi sa latest drone video update parang andami pang kulang. pero am very excited about this and sana nga mabawasan traffic sa edsa at C5.

    Skyway Stage 3 is yang Skyway na dadaan sa ilog.

    NLEX Connector is yung from C3 na dadaan sa PNR RROW at dudugtong sya sa Skyway Stage 3 sa may bandang Paco. Pacorrect na lang po kung mali.

    Di ko kitang kaya ng March 2020 kahit partial operation. Pero here's hoping na this year na ito matapos.

  5. Join Date
    Jul 2013
    Posts
    2,450
    #35
    Quote Originally Posted by yubby24 View Post
    Skyway Stage 3 is yang Skyway na dadaan sa ilog.

    NLEX Connector is yung from C3 na dadaan sa PNR RROW at dudugtong sya sa Skyway Stage 3 sa may bandang Paco. Pacorrect na lang po kung mali.

    Di ko kitang kaya ng March 2020 kahit partial operation. Pero here's hoping na this year na ito matapos.
    Ako din nalilito jan, Akala ko same project, different name. Kaya ito ni-Google ko. From the DPWH website mismo


    NLEX Connector Road




    Skyway Stage 3


  6. Join Date
    Jan 2008
    Posts
    4,726
    #36
    May bagong scheme na naman sa ilalim ng Alabang via duct.. medyo confusing kaninang umaga

  7. Join Date
    Sep 2007
    Posts
    928
    #37
    Quote Originally Posted by yapoy86 View Post
    May bagong scheme na naman sa ilalim ng Alabang via duct.. medyo confusing kaninang umaga
    I think preps ito for the impending trafficmageddon due to pile boring works for Stage 2 expansion - Alabang viaduct segment. Meron na kasi mga tarp announcements sa mga poste sa area na ito.

  8. Join Date
    Oct 2002
    Posts
    40,038
    #38
    Quote Originally Posted by yapoy86 View Post
    May bagong scheme na naman sa ilalim ng Alabang via duct.. medyo confusing kaninang umaga
    What's the new scheme?


    Sent from my iPhone using Tapatalk

  9. Join Date
    Oct 2002
    Posts
    40,038
    #39
    Quote Originally Posted by absinthe View Post
    I think preps ito for the impending trafficmageddon due to pile boring works for Stage 2 expansion - Alabang viaduct segment. Meron na kasi mga tarp announcements sa mga poste sa area na ito.
    Ano na update? And on schedule pa rin sila? Ano na plano sa SB? Kailan nila close isang lane?


    Sent from my iPhone using Tapatalk

  10. Join Date
    Oct 2019
    Posts
    45
    #40
    here's a December 2019 DPWH update on the status of various sections of Skyway Stage 3:

    METRO MANILA SKYWAY STAGE 3 (MMSS-3) | Department of Public Works and Highways

Page 4 of 8 FirstFirst 12345678 LastLast

Tags for this Thread

Skyway Stage 3 (SLEX-NLEX connector road)