Results 21 to 30 of 51
-
April 11th, 2011 03:22 PM #21
From alabang may exit ba pababa ng bicutan kasi C5 dapat ako? Nung isang araw pag akyat ko ng alabang parang wala ako napansin bicutan exit sa magallanes pa tuloy labas ko. Pag akyat sinigil kagaad ng 85 sa toll
-
-
April 11th, 2011 03:38 PM #23
wala talagang Bicutan exit. First time ko sinubukan yesterday on my way to UST. Alabang to Buendia. Same din pabalik.
-
Tsikoteer
- Join Date
- Nov 2007
- Posts
- 412
April 11th, 2011 04:05 PM #24punta akong alabang ang gusto ko sanang subukan yung toll-free daw from bicutan to alabang...
daan ko is east service rd, then tawid puntang sm bicutan. nagtanong ako sa guard ng skyway kung san entrance paakyat puntang alabang sabi nya wala, yung daw entrance dun is papuntang manila so wala akong choice kundi skyway all the way eheheh
so tanong ko is, san ba talaga yung may toll-free? bwehehehe
-
April 12th, 2011 09:29 PM #25
laking bagay din talaga to... kanina from UST again up to our house here in Las-Pinas, 1 hour lang. Rush hour period pa.
-
Tsikot Member Rank 2
- Join Date
- Jul 2006
- Posts
- 3,376
April 13th, 2011 02:25 AM #26For those clamoring for a C5 exit on the Skyway, here is some good news:
C-5/FTI/Skyway Connector
Description :
• Provide direct access to Food Terminal Inc. (FTI) from both Skyway and C-5
•
Length 6.8 km (including ramps)
•
2 to 4 lanes
•
Estimated cost PhP 5.64 Billion (US$125.33 Million)(1US$ =Php 45.00)
•
Implementation Schedule - 2012 to 2015
Project Status :
•
Feasibility Study was completed in 2006
• Detailed Design already completed ( August, 2010)- under review by the Bureau of Design, DPWH
• Expected Bidding – 3rd Quarter 2011
•
Detailed Design and Construction Schedule – 2012 to 2015
• Proposed PPP Scheme: Type 2
-
April 13th, 2011 03:11 AM #27
half baked ang skyway... gagawa lang sila di na nila ginawa ng completong completo.
1.) No skyway access from Bicutan to Sucat.
2.) No skyway access from Bicutan to Alabang.
3.) NO skyway exit from Alabang to Bicutan and Alabang to Sucat.
-
Tsikoteer
- Join Date
- May 2009
- Posts
- 406
April 13th, 2011 03:34 AM #28Personally wouldn't take the skyway if I'm just travelling to the next exit. Wouldn't even bother entering the SLEX for that matter.
-
April 13th, 2011 10:07 AM #29
1. No need. It's just one tollgate away.
2-3. Would be interesting, but I doubt there is enough traffic to justify the huge expense of building exits which will serve a tiny fraction of the tollway traffic.
RE: Alabang to Sucat: If you live in Alabang and have no BF sticker, shame on you.
Ang pagbalik ng comeback...
-
Tsikot Member Rank 2
- Join Date
- Jul 2006
- Posts
- 3,376
April 13th, 2011 04:08 PM #30Since Skyway Stage 2 opened to the motoring public, my cousin who lives in Alabang told me that traffic at the Nichols-Alabang at-grade section became lighter. It took him 6-7 minutes from Alabang to C5 exit vice versa.
You can add , The Ten Commandments, BenHur ....
Traffic!