Results 441 to 450 of 471
-
BANNED BANNED BANNED
- Join Date
- Sep 2015
- Posts
- 13,919
May 25th, 2022 11:53 AM #441
jan sa ortigas extension tatayuan?
Ang sikip kalsada magmumukhang avenida yan mabantot.
elevated bike lane lang bagay jan.
or buyback lands kung gusto lagyan train.
Pag 2lane train dapat ang kalsada sa baba eh 4lane para hindi kulob.
kung elevated road like sa araneta avenue & osmena dapat may allowanace na mas maluwag ang ilalim kaysa taas para hindi kulob.
Mga pinaglihi sa singit mga engineers ang hihilig sa masisikip na diskarte.
Para umayos problem sa traffic eh wag magbenta kotse pag wala parking. Napakabasic na diskarteng firstworld. Kaso pinas utak desel kaya utak 3rd world.
-
-
-
May 25th, 2022 04:46 PM #444
-
BANNED BANNED BANNED
- Join Date
- Sep 2015
- Posts
- 13,919
May 25th, 2022 07:56 PM #445bhoybs,
wala ka makikita kagaya ko marunong mag-analyze ng surrounding by a functionality. Majority mga engineer at architect ng pinas pang laman tiyan aka the pwede na yan movement.
Find anyone that can articulate trueQC = ako lang!!!
Kahit nga city of makati kita ko agad pagkascam. Meron kasi ako talent na hindi nakakatagal sa bolahan.
Kaya kita mo ngayon pandemic im precise = wala nga bakuna buhay na buhay.
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 52,729
-
Verified Tsikot Member
- Join Date
- Mar 2018
- Posts
- 263
May 26th, 2022 08:01 AM #447Need LRT papunta Rizal. Dapat nga noon pa. Pero grabe na trapik dyan wala pa construction, nightmare lalo pag nag start na.
Sent from my M2012K11AG using Tsikot Forums mobile app
-
May 26th, 2022 11:03 AM #448
How much taxpayer's money gets wasted so that DU30 would look good?
Free MRT rides to cost gov’t P450M
In a virtual press briefing, Michael Capati, MRT-3 officer-in-charge general manager and director for operations, said the system’s estimated losses during the free ride program from March 28 to May 24 amounting to P286 million will be funded through the subsidy budget in the General Appropriations Act which stood at P7.1 billion.
The extension for another one month would result in additional P150 million to P180 million estimated revenue loss, Capati said.
-
Tsikot Member Rank 2
- Join Date
- Jan 2007
- Posts
- 2,227
May 26th, 2022 11:26 AM #449Technically the money is not being wasted because it's being used to subsidize public transport.
Presumably the revenue loss from MRT operation can be reclaimed elsewhere, like if meron percentage based tax on crude/refined oil imports especially with prices as high as they are now.
I seem to recall reading a temporary tax on fuel being imposed two years ago to fund COVID measures. If that tax is still in place and COVID seems to be winding down, then putting it to use subsidizing public transport is not a bad use of the funds.
-
BANNED BANNED BANNED
- Join Date
- Sep 2015
- Posts
- 13,919
August 2nd, 2022 09:49 PM #450kailan na ba sisimulan yung MRT train. Dapat incorporate na din bikelane sa gilid ng train. Ako natuwa sa experience ko sa LRT-2 ang dali ng buhay may exit going sogo hahhahha!!!! Tapos kung gusto ko mag mall ang dali na din going araneta center. Pwede pala hindi na magdala kotse.
ang magiging problema lang dito yung sa cainta kasi ang sikip ng kalsada pag tawid ng tiendesitas. Ano mga lands ibabuy ng governement jan.
Dapat ang namumuno sa pinas maging utak train kasi mas madali buhay tapos 25pesos lang!!! Ano kwenta ng pakotse-kotse eh kung puro traffic naman. Nung nasa xentro mall nga ako hindi ako sumakay ng bus/jeep kasi ang traffic so nilakad ko na direcho marcos highway. Nakapag wanderer pa ako sa decathlon at sm masinag tapos uwi na sakay lrt-2.
kung pwede lang talaga underground train mas ok sana.
New app update for Gcash. It locks the Gcash account to the particular device you are using so you...
National ID Law