Quote Originally Posted by uls View Post
pave over the entire length of MRT3

put those edsa buses up there

bawas traffic sa edsa at the same time may masasakyan sa itaas
Wouldn't that cause traffic? Since 2 way lang sa taas? HAHAHA

And ayaw pang umalis ng station/skayan hanggat di puno.