June 1st, 2025 09:47 AM #51
Postpone Edsa rehabilitation, senator urges - Philippine Daily Inquirer
Postpone Edsa rehabilitation, senator urges
-
Tsikoteer
- Join Date
- Mar 2008
- Posts
- 54,253
June 1st, 2025 11:12 AM #52
-
-
June 1st, 2025 12:42 PM #54
Marcos postpones EDSA rehab | GMA News Online
Marcos postpones EDSA rebuild
-
-
-
June 1st, 2025 01:19 PM #57
Well that didn't take long...
Marcos Jr. suspends EDSA rehabilitation to find 'better way' | ABS-CBN News
-
Verified Tsikot Member
- Join Date
- Sep 2010
- Posts
- 3,049
June 1st, 2025 07:55 PM #58Haha it's a prank! hehe
Now na nak hold, ngayon nila deploy yung sinasabi nilang alternatives rides like additional buses & trains. Para kung may problema man, ma address na bago ma resume to. Baka ideal start nila summer next year, para walang school & hindi madelay ng ulan. At least they'll have more time to prepare for it & think din kung anong magandang number coding scheme.
-
June 2nd, 2025 09:49 AM #59
I don't agree sa postponement, this looks bad on the leadership, matagal na approved yan project, one of the biggest project if not the biggest siguro.
Either papogi lang ito or meron nag lobby for reason we know what
Sent from my iPhone using Tapatalk
-
June 2nd, 2025 10:43 AM #60
After all the hullabaloo, the press briefings and all the traffic congestion mitigation schemes, the Prez just decided to throw a monkey wrench on the whole thing.
But TBH, I can't blame him. From the get-go, everything was going too fast. The official announcement for the EDSA rehab project only came out in May, and then it was scheduled to begin in less than a month? I've worked on projects that are magnitudes smaller and less complex, yet, it had more elaborate planning and preparation.
And their knee-jerk reaction was evident. Yun lang odd-even, among other congestion mitigation schemes, everyday since the announcement nagbabago yung parameters at ang daming clarifications. It's quite apparent that they're thinking about it as they go along.
I don't claim to be an expert, but at least for a project this big.... 12 months in advance ang notice. Alternate routes are being established. Schedules of when and which segments of EDSA will be worked on. Areas where the odd-even scheme will be implementet (since EDSA will be worked on in segments), etc. Just broad strokes of how things should've been done.
Eventually this undetaking has to take place but it is the planning and coordination that is...
EDSA Rehab/Rebuild and Guadalupe Bridge Repair