Passed through it on my way home this afternoon. Nawala na yung traffic. If I recall, it was supposed to be finished on September according to the billboards that lined the construction before.
passed through it both ways 2 times, to go to santo domingo church and back in the afternoon, then to heritage hotel and back in the night. ganda nga. parang mas mataas (or should i say mas malalim) compared dun sa underpass sa quezon ave/edsa.
laking swimming pool nyan pag bumaha yung araneta.
Na anticipate na raw nila yan, mga hapon ata tumulong sa design o sa planning..lets see if maging ok, at least mas kumpyansa ako sa hapon kesa sa chinese..