The car is honda city 2009, it has 4 stud on each wheel at yung isang stud sa back right tire eh nabali, loose thread daw na pinilit, kaya nung nagpa vulcanize ako eh binali na lang.
now akala ko eh yung stud lang papalitan and it would be cheap, but someone told us na hindi na tulad ng dati yun, ngayon eh whole plate na papalitan, which would cause at least 10k. nag suggest sila na welding na lang.
question, gano ba kadelikado ang running on 3 out of 4 stud sa back wheel? wala pa kasing time pagawa yung sasakyan eh pero ginagamit. at pede na kaya yung welding, hindi delikado?