New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 3 of 6 FirstFirst 123456 LastLast
Results 21 to 30 of 57
  1. Join Date
    Sep 2005
    Posts
    15,326
    #21
    eto daw after 30 months..


  2. Join Date
    Dec 2004
    Posts
    850
    #22
    Quote Originally Posted by _Qwerty_ View Post
    They closed it 1 day earlier.. kahapon sarado na Sept. 19 kaya sobrang trapik sa JP Rizal..
    Bukas pa. I just passed by today. This Sunday daw sasaraduhin.

    Sent from my Pixel 2 XL using Tapatalk

  3. Join Date
    Mar 2008
    Posts
    52,731
    #23
    Quote Originally Posted by _Qwerty_ View Post
    eto daw after 30 months..

    un-believable!
    just lookit the traffic-less roadway under the bridge...

  4. Join Date
    Sep 2003
    Posts
    25,070
    #24
    100 % closed...






  5. Join Date
    Apr 2014
    Posts
    5,246
    #25
    Quote Originally Posted by dr. d View Post
    un-believable!
    just lookit the traffic-less roadway under the bridge...
    Add to it, the blue pasig river [emoji1]

    Sent from my BLL-L22 using Tapatalk

  6. Join Date
    Sep 2005
    Posts
    15,326
    #26
    sobra na trapik as Makati Ave.. tapos yung dulo sa JP Rizal may hukay pa.. nagiging 2 lanes lang..

  7. Join Date
    Mar 2008
    Posts
    52,731
    #27
    i have a few thoughts.
    if the bridge is simply too small and not structurally compromised, perhaps its replacement can be done later, when the other bridges that are in dire need of repair/replacement due to structural compromise, are thru.
    so as not to worsen the Christmas traffic.

  8. Join Date
    Oct 2012
    Posts
    27,626
    #28
    Quote Originally Posted by dr. d View Post
    i have a few thoughts.
    if the bridge is simply too small and not structurally compromised, perhaps its replacement can be done later, when the other bridges that are in dire need of repair/replacement due to structural compromise, are thru.
    so as not to worsen the Christmas traffic.
    its compromised already in my opinion hence theyre expediting the widening... this will mask their ineptness

    Sent from my SM-N960F using Tapatalk

  9. Join Date
    Oct 2014
    Posts
    1,232
    #29
    Quote Originally Posted by dr. d View Post
    i have a few thoughts.
    if the bridge is simply too small and not structurally compromised, perhaps its replacement can be done later, when the other bridges that are in dire need of repair/replacement due to structural compromise, are thru.
    so as not to worsen the Christmas traffic.
    Nakikita kong wala silang paki alam sa Christmas doc. Kasi pag naumpisahan baka sa "labas ng bansa" mag Christmas yung naka billing.

  10. Join Date
    Nov 2009
    Posts
    12,363
    #30

Page 3 of 6 FirstFirst 123456 LastLast

Tags for this Thread

Estrella - Pantaleon Bridge to be closed for 30 months starting Sept. 20