New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 1 of 6 12345 ... LastLast
Results 1 to 10 of 57
  1. Join Date
    Sep 2005
    Posts
    15,326
    #1
    arrrgh.. dito pa naman ako dumadaan.. wala naman ibang alternate route.. mag tra trapik na naman sobra sa Makati Ave nyan going to Makati Manda Bridge..

    9-year-old bridge already needs replacement — DPWH | Inquirer News


    The 30-month closure of a bridge connecting the cities of Makati and Mandaluyong, which is set to start this month, can affect about 40,000 vehicles daily, diverting them to inner streets and aggravating traffic conditions.

    In a hearing held on Wednesday by the House committee on Metro Manila development, Director Virgilio Castillo of the Department of Public Works and Highways (DPWH) explained why Estrella-Pantaleon Bridge already needed replacement even though it was opened only nine years ago.

    Castillo gave Sept. 20 as the tentative date of the closure, but said it could still be moved as the DPWH was still in talks with the Metropolitan Manila Development Authority (MMDA) to come up with better traffic management plans addressing the expected gridlock.

  2. Join Date
    Mar 2008
    Posts
    52,523
    #2
    is it being closed, because it is now weaker and has to be strengthened?
    or is it being closed, to make it wider?
    Last edited by dr. d; September 14th, 2018 at 01:20 PM.

  3. Join Date
    Sep 2005
    Posts
    15,326
    #3
    according don sa news.. weak na din daw.. so totally tatanggalin and papalitan nang bago.. gagawing 4 lanes.. so dapat baguhin din nila yung streets connecting the bridge.. dapat 4 lanes na din.. otherwise magiging bottleneck na naman yan.. 2 lanes ang one way nang bridge tapos single lane lang pag baba..

    Quote Originally Posted by dr. d View Post
    is it being closed, because it is now weaker?
    or is it being closed, to make it wider?

  4. Join Date
    Oct 2012
    Posts
    27,626
    #4
    Quote Originally Posted by dr. d View Post
    is it being closed, because it is now weaker and has to be strengthened?
    or is it being closed, to make it wider?
    overcapacity... it's physically 36yo...

    Sent from my SM-N960F using Tapatalk

  5. Join Date
    Jan 2018
    Posts
    844
    #5
    This is such a hassle for everyone using this bridge and the Makati-Mandaluyong one.

    Dapat maglaan muna sila ng alternative route na matino bagong ipasara yan.


    Sent from my iPhone using Tapatalk

  6. Join Date
    Sep 2005
    Posts
    15,326
    #6
    pati JP Rizal going to Guadalupe sigurado trapik yan.. and 30 months!!!

  7. Join Date
    Mar 2008
    Posts
    52,523
    #7
    Quote Originally Posted by SpinCycle View Post
    This is such a hassle for everyone using this bridge and the Makati-Mandaluyong one.

    Dapat maglaan muna sila ng alternative route na matino bagong ipasara yan.


    Sent from my iPhone using Tapatalk
    i can see it now.
    magla-laan ng alternative temporary bridge.
    then, after the new bridge opens...
    "let's not close down the alternative bridge. let's keep it in service."
    heh heh.

  8. Join Date
    Apr 2014
    Posts
    5,246
    #8
    Portion of guadalupe bridge will also be closed down this december afaik for repairs. Kawawa mga nagtrtrabaho sa makati tapos qc ang uwi vice versa

    Sent from my BLL-L22 using Tapatalk

  9. Join Date
    Sep 2003
    Posts
    25,039
    #9
    Quote Originally Posted by dr. d View Post
    is it being closed, because it is now weaker and has to be strengthened?
    or is it being closed, to make it wider?
    Maybe they are "widening" the bridge to get rid of the squatters that lived between the bridge and Acqua Residences...

  10. Join Date
    Mar 2008
    Posts
    52,523
    #10
    Quote Originally Posted by Monseratto View Post
    Maybe they are "widening" the bridge to get rid of the squatters that lived between the bridge and Acqua Residences...
    if that is the intent, then it will backfire.
    they are simply re-locating them to a new, enlarged apartment, under the bridge's anchorage.
    heh heh.

Page 1 of 6 12345 ... LastLast

Tags for this Thread

Estrella - Pantaleon Bridge to be closed for 30 months starting Sept. 20