Anybody know when this is scheduled for completion?
^^^ I do not know.... It's really scary to drive this stretch of the road..... That's the reason why our weekend sojourn to the south (Laguna/Batangas/Quezon) stopped.
A month ago, work is ongoing starting at Carmona exit (entered at Alabang). But before this, there are still segments that are still left unfinished...
7505:bravo:
bad trip nga yan. parusa talaga. dapat nagbaba man lang sila ng toll fee during the rehab kasi lugi ka naman sa gas dahil sa traffic. worse, wala man lang silang posted na completion date or project schedule. ang wierd pa ng gawa. pa-zigzag ka sa daan. magugulat ka na lang na yung gitnang lane ang ginagawa. maya maya yung gilid naman.
I just got back from Laguna. Traffic was horrible from Sta Rosa to Sucat. Took us two hours to travel that stretch of road!!! Normally that would take us less than an hour.
Sobrang parusa talag. Parang lasing ang nagplan ng rehab. Left, right center lane, lahat may hukay. Pang slalom ang SLEX!![]()
How many years na ba ang repairs?
Ang masaya dito ay, SLEX under repair, C5 elevated U turn under construction, EDSA jam packed bumper to bumper traffic. Saan ka lulusot? If you guys know a less congested route from Slex to QC, pls share.
SLEX = Sorry Excuse for a Expressway
and even when traffic is not so bad.... it's still bad for my car. My front bumber is already pockmarked with lots of small holes/scratches caused by gravel.
Bro.,- I think I know the road that you're referring to. I believe that this is the route that the Alabangers drove through a couple of summers ago.
You see, my nearest entrance to SLEX is Alabang or Sucat. That means I need to drive through SLEX (going north), C5 (with the Kalayaan intersection's heavy traffic), turning right at Ortigas and into that road... It's a long way for me.....
Maybe you know of a shorter route?
7606:mobile1: