so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.
so anybody know wtf they're building right before the filinvest exit? are they just doing road widening thing or something else entirely? parang christmas traffic kanina eh, afternoon na meron pa din counterflow.
Extension daw ng skyway to Susana heights.
Sent from my iPhone using Tapatalk
it's Skyway extension.....
kamot ulo na lang ako kung bakit di pa nila ginawa yan while they're working the Alabang segment.
kung inayos na lang kaya nila noon hanggang Alabang na ang entry at exit, tapos Susana na ang dulo.
![]()
...realizing now the Amkor ramp (entry/exit) naging bottleneck north and south bound.
Kayo naman yun budget importante. Itong segment eh ₱10B na at least according to the photo posted.
Sana nag ambag mga affected sa traffic. ngayon para nasabay na dati. ✌🏼️[emoji39]
Sent from my iPhone using Tapatalk
thanks to all who replied![]()
major construction pala 'to. i remember when the first phase was constructed in the 90s - 2+ hours of traffic to makati, and that was with less vehicles on the road. it did get better after but, fsck me, it was hell during construction. pretty much what's happening with the other phases of the skyway happening around metro manila.
looking forward to the skyway being extended to susana. in the meantime, i think i'll move back into the city for 2-3 years until this all gets sorted out.
sino na nga yun lilipat daw ng tagaytay at commute daily to bgc? good luck with that and this construction hahahah
Saan ka dadaan yun extention para ma connect sa main skyway? Diba sabi dati kaya hinde nagawa yan dahil Hindd pwede mag skyway over alabang viaduct?
Sent from my iPhone using Tapatalk
Meh pier markings na sir both NB and SB.
Problema lang yung "katiting" na "shoulder" sa outermost lane ay mawawala nadin gawa ng S2 expansion piers.
This is the first time I've heard this sir.Diba sabi dati kaya hinde nagawa yan dahil Hindd pwede mag skyway over alabang viaduct?
Eh yung Stage 3 Section 5 tumawid sa EDSA / Line 1 (taas na nun).
Good luck! Kailanga expected completion?
Sent from my iPhone using Tapatalk
4 na pierheads na meh porma ng rebars prior to Soldier Hills overpass.
Soil testing asa N40++ na ata. Konti nalang para umabot sa Hillsborough on-ramp (N50-55 ata).
Tingin ko tatapusin muna yun northbound before gawin yun southbound.
Sent from my iPhone using Tapatalk
can't they make them spans longer, so's they do not have to cordon off the road ?