Results 2,041 to 2,050 of 2562
-
May 12th, 2015 09:20 AM #2041
na OT na natin yung thread.
Again, coming from santa mesa ka diba? take osmena then take the flyover ng buendia.
ang MAPSA nasa ilalim nun, which is hindi mo naman dadaanan.
Ang nag mamando ng traffic dun sa osmena is yung mga nasa construction din ng skyway.
walang MMDA / MAPSA along osmena.
Nabasa ko din EDSA, C5 kahit daanan mo yung part ng makati area may window time yan.
i think same logic applies sa osmena.
-
Tsikoteer
- Join Date
- Mar 2013
- Posts
- 6,160
May 12th, 2015 10:33 AM #2042The news article is bogus. The article was posted in mid april. Its mid-may and still no major news outlet has given the announcement
-
May 12th, 2015 10:48 AM #2043
Thank you for the inputs. Maybe I will take Buendia flyover along Osmeña but if heavy traffic is in sight then I can take alternative route in Filmore. And to be safeguarded, I will have myself a copy of the MMDA regulation on UVVRP in case lang na masita hehe.
-
May 12th, 2015 11:46 AM #2044
Pwede din yan flyover in Buendia pero hindi ka makakapasok ng skyway after the flyover, sa Magallanes na pasok mo.
-
May 12th, 2015 11:53 AM #2045
-
May 12th, 2015 12:01 PM #2046
HIndi na sir, meron ng block yun right side such that yung galing lang ilalim ang pwedeng mag merge back to Osmena but not the other way around. They blocked it kasi nag sasalubong both sides yung going up skyway from flyover & those from under going Osmena. It cause traffic & some accident.
-
May 12th, 2015 12:06 PM #2047
-
May 12th, 2015 12:49 PM #2048
-
May 12th, 2015 02:39 PM #2049
Date acquired: 25 February 2015
License Plate, OR/CR received: 25 April 2015
Today: 12 May 2015, pinadalhan ng LTO Operations Div ng Show Cause Order and dealer ko. Yung SCO dated 30 April 2015 pa. Talaga naman tong LTO na to...
-
May 12th, 2015 10:14 PM #2050
Acquired Apr24-2015.
Was about to file formal complaint dahil nababagalan ako sa release ng OR CR at plate compared sa iba na within 2wks talaga.
Got the plate today! Dated May-7 yung OR CR. No more complaints.
- - - - - - - - - - - - - - - - - - - - - -
Acquired Apr24-2015.
Was about to file formal complaint dahil nababagalan ako sa release ng OR CR at plate compared sa iba na within 2wks talaga.
Got the plate today! Dated May-7 yung OR CR. No more complaints.
Puwede i try, 1. Palit air filter 2. Linis throttle body 3. Linis MAF sensor 4. Check spark...
high idle RPM at engine start