Results 1 to 2 of 2
-
May 6th, 2011 05:32 PM #1The Metropolitan Manila Development Authority (MMDA) advised motorists to take alternate routes as repair work on the Buendia-Osmeña Flyover in Makati City begins at 9:00 p.m. on Friday.
In its advisory, the MMDA said the northbound lane of Osmeña highway (crossing Buendia Flyover) will be partially closed because the Department of Public Works and Highways is set to conduct repair works.
-
May 6th, 2011 05:49 PM #2
sana gibain na lang nila at connect it tothe sky way na lang . kung galing ka skyway exit nun sa buendia trapik din. pag papasok ka naman ng skyway coming from that flyover sa mismong foot ng bridge ka biglang liko eh ang mga bus dun nag standby for loading at unloading din
hindi na ayos yung design dun sa area na yun
Production of the next gen Kicks confirmed .......
2025 Nissan Kicks