Results 41 to 50 of 177
-
November 14th, 2008 11:34 AM #41
Nilagay ko rito sa thumbs up kasi ang mga puno na tatamaan ng construction ay ginawang bola ang mga ugat para mailipat ng lugar. Saan? Hindi ko alam. Ang importante for me ay hindi ito basta-basta na lang pinutol.
Nagyari ito mga 2 days ago.
Sana ang actual construction ay next year na para hindi magiging pahirap during this season.
Mods, paki edit na lang ang title, dapat begin ang bein. sorry.
-
-
November 14th, 2008 02:22 PM #43
-
November 14th, 2008 02:27 PM #44
-
November 14th, 2008 02:57 PM #45
Phase 1 is complete. If you take this U turn, you go back to eastwood.
Phase 2 is the U turn to go back to SLEX.
-
November 14th, 2008 06:05 PM #46
Iwas muna ako dyan pag nagsimula na construction. Ngayon pa lang ma-traffic na dyan.
:yawn: [SIZE="1"]3774[/SIZE]
-
November 14th, 2008 06:58 PM #47
Ang tagal na ng poster ni Gloria re. construction.
Puro preparation pa lang naman so for.
Post ko rito pag nag simula na or kung may effect na sa traffic.
Sana next year na. Ito ang normal route ko sa umaga ang gabi.
-
November 15th, 2008 01:57 PM #48
Kagabi, may mga nakita akong mga demolition ng mga bahay na malamang tatamaan ng construction.
So far wala pa naman effect sa traffic.
-
November 24th, 2008 02:37 PM #49
As of today, nakapag simula na silang mag clear sa center island. Minimal pa ang effect sa traffic. Mukang magsisimula na ang construction.
-
November 24th, 2008 07:31 PM #50
Friday night, northbound, sobrang traffic. Akala ko ito na ang cause ng heavy traffic dahil sa may Shell gas station pa lang, gapang na. Hindi pa pala,- iyon palang mga U-turns after the Pasig River bridge....
7000:diver:
Kwento ng katrabaho ko, meron daw sya officemate dati na Italiano na tinanong daw bakit...
Traffic!