    Quote Originally Posted by ice15 View Post
    agree. not a fan of delaying the repair... or finding a solution to make the project faster.

    do it the proper way once and problem na ng susunod na generation yung next rehabilitation.
    Yung pondong inilaan para diyan, sana hindi kangkungin...

  2. Join Date
    Oct 2002
    Posts
    40,599
    #2
    Kawawa yun mga contractors. Yun preparation and mobilization nila for a project this big. Yun mga advance orders ng materials baka nag pirma na ng leases for heavy machineries. Yun mga expedited na hiring ng tao. Ewan ko dapat ituloy na yan.

    There's not way around it, traffic talaga habang ginagawa. The more they delay lalong hinde nanaman magagawa.

    Mukhang tama nga si dutiti, weak leader


    Sent from my iPhone using Tapatalk

  3. Join Date
    Jul 2013
    Posts
    7,336
    #3
    Quote Originally Posted by shadow View Post
    Kawawa yun mga contractors.
    naisip ko lang over the weekend... sino kaya contractor nitong EDSA Rehab project???

  4. Join Date
    Nov 2002
    Posts
    2,043
    #4
    Quote Originally Posted by ice15 View Post
    agree. not a fan of delaying the repair... or finding a solution to make the project faster.

    do it the proper way once and problem na ng susunod na generation yung next rehabilitation.
    Just like the Rehab of Boracay.
    A lot of people hated it, loss of jobs , etc, etc, etc.
    Look at it now compared to before the rehabilitation.

    Quote Originally Posted by ice15 View Post
    naisip ko lang over the weekend... sino kaya contractor nitong EDSA Rehab project???
    Multiple contractors according to the grapevine. Not just one. it meant to speed up its construction.

  5. Join Date
    Oct 2010
    Posts
    2,551
    #5
    Yang rehab pamera lang yan
    Wala ngang pinapakita na conceptual outcome ng rehab.

  6. Join Date
    Oct 2002
    Posts
    5,603
    #6
    Eventually this undetaking has to take place but it is the planning and coordination that is crucial.

  7. Join Date
    Jan 2010
    Posts
    1,996
    #7
    Quote Originally Posted by ale828 View Post
    Multiple contractors according to the grapevine. Not just one. it meant to speed up its construction.
    The gov't got burned with the delays of BF over the North EDSA projects. "The more, the merrier" is I think the current flavor of the month.

  8. Join Date
    Jan 2009
    Posts
    6,460
    #8
    Quote Originally Posted by shadow View Post
    Kawawa yun mga contractors. Yun preparation and mobilization nila for a project this big. Yun mga advance orders ng materials baka nag pirma na ng leases for heavy machineries. Yun mga expedited na hiring ng tao. Ewan ko dapat ituloy na yan.

    There's not way around it, traffic talaga habang ginagawa. The more they delay lalong hinde nanaman magagawa.

    Mukhang tama nga si dutiti, weak leader
    Tingin ko matutuloy yan. The timing is ripe para maging 'legacy' ni Prez before his term ends.

    Wala eh, they are all playing improv.... no script, no coordination, just playing for the Likes.

  9. Join Date
    Apr 2005
    Posts
    3,004
    #9
    1 month lang naman yung hold. I also felt too short yung notice. So baka by January gawin na yan. Baka hindi rin ready pa ang mga gagawa.