sana nga mag open na tagal na nito, pag nag open yan daming matutuwang OFW![]()
sana nga mag open na tagal na nito, pag nag open yan daming matutuwang OFW![]()
sana nga matuloy na mabuksan ito para naman medyo makalapit tayo sa airport ng mga karatig nating bansa.
try to watch this guys
http://www.gmanews.tv/video/24510/Flaws-found-in-NAIA-3's-first-public-dry-run
hindi nagana aircon, sira baggage conveyor, sira aerobridge, etc![]()
^nakuw yari!
kung sabagay at least it looks like the wheels to open the darn place is finally set in motion na rin so i guess it's just a matter of time![]()
there's also the planned international airport at Sangley Point in Cavite.
http://www.skyscrapercity.com/showthread.php?t=500190
Good morning mga bossing, eto na ang mga latest pics sa T3, kanina lang kinuha, you won't see this in your daily newspaper hehehe...chaosandcreation's images
http://www.flickr.com/photos/chaosandcreations/
A portion of "NAIA 3 opens for Arroyo, but obstacle remain for commenrcial operation" dated July 1, 2008
By LALA RIMANDO [SIZE=2]abs-cbnnews.com/Newsbreak[/SIZE]
It seems that there are still grey areas as far as structural stability is concerned in events of strong earthquakes. Why make hasty decisions (re opening) while compromising human life and safety against commercial issues then at the end of the day, magtuturuan na naman ang government at private sector of who's responsible pag nagkaroon ng tragedy.[SIZE=2]Structurally safe?[/SIZE]
[SIZE=2]At the core of the negotiations among Takenaka, TCGI, and MIAA is the timing of the terminal's opening. [/SIZE]
[SIZE=2]TCGI's position was to repair and address the structural concerns first before opening up the terminal to the public. According to TCGI's report, the building has serious structural faults and is therefore unsafe and could harm passengers.[/SIZE]
[SIZE=2]A pre-final report prepared by TCGI Engineers concluded that the terminal structure failed to comply with original design plans as well as with building code requirements aimed at preventing collapse during earthquakes. While building foundation stability was not a cause for concern, TCGI noted that "the structure was not constructed to the level expected for a facility of such magnitude and importance." [/SIZE]
[SIZE=2]Takenaka's position, on the other hand, was exactly the opposite. It stood its ground and constested TCGI's report. It reportedly said that with just a few polishing, the terminal is ready for use anytime. [/SIZE]
[SIZE=2]Due to the deadlock in the talks with Takenaka over the scope of the repair work, MIAA finally let them go as a general contractor in January 2008. [/SIZE]
[SIZE=2]Cusi said that at that time, "We did not have a choice because we had to follow our consultants (TCGI)." TCGI's report was not finalized since, according to the MIAA officials, its contract with MIAA already lapsed. [/SIZE]
[SIZE=2]With the impasse, the Association of Structural Engineers of the Philippines (ASEP) came to the rescue. [/SIZE]
[SIZE=2]The services of ASEP were engaged by congressmen after a recent Transport Committee hearing that inquired on the delayed opening. (ASEP was also engaged by MIAA to investigate why the ceiling at the arrival hall collapsed in March 2007. ASEP said it was due to poor workmanship, substandard materials and lack of a proper construction plan.)[/SIZE]
[SIZE=2]ASEP's position was the middle ground: It reportedly acknowledged that there are defects in the structure that needs to be addressed soonest. But they reportedly said these defects only account for less than 10 percent of the entire structure. Thus, they recommended that while repair work on these is ongoing, some portions of the terminal, which were deemed safe, could already be open for business. [/SIZE]
[SIZE=2]In other words, ASEP's position became the seal of approval that the terminal building is structurally safe by the time President Arroyo's plane arrived and when NAIA 3 partially opens in July.[/SIZE]
[SIZE=2]Code-based vs. Performance-based[/SIZE]
[SIZE=2]To complement ASEP's findings, Montalbo said MIAA also engaged the services of a globally-recognized engineering firm, which was tasked to provide cheaper and faster alternative to the previous recommendations of TCGI. [/SIZE]
[SIZE=2]Montalbo said TCGI's findings were based on technical standards using strict engineering codes. It said the building constructed by Takenaka did not pass these standards and recommended either a replacement or expensive overhaul works. [/SIZE]
[SIZE=2]With the intense pressure and limited resources to do just that, the new engineering consultants of MIAA employed a performance-based rather than a code-based standard.[/SIZE]
[SIZE=2]"When a structure is not compliant with the codes, it does not mean it will already collapse during an earthquake. What the new consultants considered was the actual performance of the building," Montalbo said.[/SIZE]
[SIZE=2]The building's performance was virtually tested during computer simulations. "The consultants modeled the building in their computers, introduced seismic events, and saw how the building will perform. From those simulations, they determined which areas need to be remedied," Montalbo added.[/SIZE]
[SIZE=2]He gave an example: "When a column is failing, under a code-based standard, we need to remove the tiles and ceiling, then thicken or replace it. But under the performance-based standard, we can put braces here and there or add another column. By adding these elements, the building can still absorb the shocks during an earthquake. These might have the same effect as the costly replacements." [/SIZE]
[SIZE=2]MIAA will work on their foreign consultants' recommendations and hopes to have implemented them all by the time international flights commence by yearend. [/SIZE]
![]()
It's about time. Naiiwanan na tayo ng mga kapitbahay. This is Singapore Changi T3. WOW!
Thailand Bangkok Airport, gets 10 million passenger a year vs. 2 million for the Philippines.
We're years behind our neighboring countries. The airport and its terminal gives the traveller his or her first impression of the country he or she is visiting, so it should always be a pleasant experience....
Not sure with our airport and terminal....
6303:fetch:
nakow. pero di naman gnun kaganda sa thailand dati ah nung 2003 nyahaha...
gibain na sana ung lumang naia
you must be referring to the old bangkok don muang airport. domestic flights na lang ngayon yung don muang. bangkok has a newly opened airport, the suvharnabumi airport which is the picture posted by hein. ganda ng duty free dun tinalo ang duty free ng singapore. di ko lang gusto ay yung finish ng building, bare concrete walls, para bang kinapos sila sa budget at hindi na na-finishing ang mga walls. also the toilets are like afterthoughts ba, something like "oooops, we have no toilets" so those are positioned in obscure places, hard to find.
so cebu pac passengers will be taking first dibs in today's official start of operations. i hope everything goes worry free for this new/old terminal's official debut![]()
^^^^
tama ka sir, napag-iiwanan na tayo ng mga kapitbahay natin dito sa asya. sana naman pagandahin ng gobyerno airport natin kasi ito ang unang nakikita ng mga dayuhan eh, kaya dapat maganda ang unang impresyon nila.