New and Used Car Talk Reviews Hot Cars Comparison Automotive Community

The Largest Car Forum in the Philippines

Page 2 of 2 FirstFirst 12
Results 21 to 28 of 28

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. Join Date
    Jan 2005
    Posts
    282
    #1
    Quote Originally Posted by OTEP
    Di naman pinuputol sa Filmar. Binebend lang nila.
    Matatapos kya ng 1 whole day kung pagawa ako dyan??? montero 92 v6 , pampanga pa ko e....

  2. Join Date
    Jan 1970
    Posts
    219
    #2
    dont go over 2 inches kc boy......... you can combine a little torsion crank (1 inch and 2 body 3 na yan.............

  3. Join Date
    Jun 2003
    Posts
    1,961
    #3
    1 week yun minimum na narinig ko sa mga shops napagtanungan ko ng body lifts.

    hey guys, tsige tsige... try ko muna yun torsion bar thingie...

    since south ako, ok ba yun red back sa may las pinas?

    meron din ride inc sa alabang town center... which kaya?

  4. Join Date
    Oct 2002
    Posts
    22,658
    #4
    Sa filmar 4-7 days nga yata ang total work time. Pero pwede din kasing dalhin dun ng one day para sukatan ng blocks then iuwi mo muna while they prepare everything. Tapos babalik ka na for instillation na lang. 1-2 days yun.

    http://docotep.multiply.com/
    Need an Ambulance? We sell Zic Brand Oils and Lubricants. Please PM me.

  5. Join Date
    Jun 2005
    Posts
    73
    #5
    :::
    Last edited by Engr; June 10th, 2005 at 05:43 AM.

  6. Join Date
    Oct 2004
    Posts
    2,315
    #6
    ang tagal pala mag palift akala ko 1 day lang

  7. Join Date
    Feb 2004
    Posts
    200
    #7
    dba yung iba ginagawa.. combination ng body lift at suspension lift ba yun? is this better?

  8. Join Date
    Oct 2002
    Posts
    22,658
    #8
    Independent naman ang body lift sa suspension lift. Mix and match as you like.

    http://docotep.multiply.com/
    Need an Ambulance? We sell Zic Brand Oils and Lubricants. Please PM me.

Page 2 of 2 FirstFirst 12
Body Lifting