Results 1 to 10 of 102
-
Verified Tsikot Member
- Join Date
- Sep 2004
- Posts
- 104
March 24th, 2006 03:30 PM #1guys, ever heard this?
this is the reason they are delaying the opening. grabe kung totoo at reclaimed area lang ito.
-
-
March 24th, 2006 03:39 PM #3
heard about it, parang some part of the reclamation isn't solid enough after the structure is built...
-
FrankDrebin Guest
-
March 24th, 2006 03:46 PM #5
heard it also, true nga daw, dapat feb25 yung opening. then march then now may or june na.
-
March 24th, 2006 03:49 PM #6
sayang naman ito. dapat na survey muna ng maayos yung lugar bago tinayo yung mall dyan.
-
Verified Tsikot Member
- Join Date
- Mar 2006
- Posts
- 143
-
Verified Tsikot Member
- Join Date
- Nov 2005
- Posts
- 824
March 24th, 2006 03:52 PM #8yup! I can confrim this! yung parang gimikan part nya sa bandang likod basag lahat ng windows kasi medyo tumagilid yung structure
-
March 24th, 2006 03:52 PM #9
Malapit kase talaga dun sa mismong dagat yan eh.. saka sobrang bigat ng structure, baka hindi makaya ng lupa. Pero parang nakakapagtaka din dahil di naman sila mag co-construct ng ganyang kalaki kung di kakayanin ng foundation or ng lupa. Baka naman tsismis lang.
-
March 24th, 2006 03:52 PM #10
Nakakatakot pala pumunta dyan sa SM Mall of Asia baka bigla na lang lumubog ang nilalakaran mo dun..
Be careful with channels like "China Observer" on YouTube. There is a clear bias in their posts and...
Xiaomi E-Car