I would like to get your inputs if i have miss something, we are planning to build a house (83sqm lot 8x10), were planning to have a 3 floors (no roof - open lang siya) on the left part and 2 floors on the right part of the house.
i did make some inquiries and able to get these information of materials to use and their quantity, am not sure if i did miss something, hope you guys with construction knowledge or not help us out, if we miss something, semi furnish 1st and 2nd floor, yung 3rd floor ay kahit bare lang muna..kasi gagawin sampayan lang naman eh..kasi we are maximizing the lot area since hinde naman siya ganun kalaki.
We were able to get a Construction foreman na payag na labor sa kanila and lahat ng materiales samin.
Am not sure kung over acting yung quantity and price ko, pero mas maganda na siguru yung sobra kesa kulang..
Any inputs would be VERY greatly appreciated..
here's the list of materials with their prices and quatity:
Tiles 30 x 30 ( Outside, 1st, 2nd and 3rd Floor) = P25,000
Granite (Kitchen Counter, 2nd floor bathroom) = P50,000
Cement - 1,000 bags - 220/per bag = P220,000
Hollow Blocks - 7000pcs - 5" - 10/pc = P70,000
Sand Gravel - 10 elf truch - 5000/truck = P50,000
***Round deform bar***
250pcs 10mm x 6m = 140/pc = P35,000
250pcs 12mm x 6m = 200/pc = P50,000
150pcs 16mm x 6m = 350/pc = P52,500
Wirings and Pipings - P60,000
***Marine Plywood***
50pcs 1/4" - 4'8 - 400/pc = P20,000
50pcs 1/2" - 4'8 - 400/pc = P35,000
25pcs 3/4" - 4'8 - 400/pc = P30,000
***Cocolumber (Standard Size)***
Standard Size - 300pcs - 120/pc = P36,000
Doors and Windows and Grills - P100,000
Paints interior and exterior - P50,000
Lights and Toilet fixtures - P80,000
Roof Sheets (pre-painted), Trusses (Angular Bar), Fence, Gates and Insulation Foil - P120,000
Accessories & Miscellaneous (Door Knob, Cement Mixer and other construction supplies) - P100,000
Labor - P500,000 (Pakyawan Labor only)